Laserfiche WebLink
Indian River County Department <br />LABOR AND MATERIALS COST ESTIMATE FROM LABOR <br />LABOR CONTRACTOR - BLUE GOOSE <br />Project : Loop Completions <br />Date: October 5, 2015 <br />of Utilities <br />CONTRACTOR'S BIDITEM LIST <br />CONSTRUCTION <br />LABOR COST <br />MATERIALS <br />.Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Labor Unit <br />Price _ <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />A. 20th Avenue s/o 21st Street SW WM Loop <br />Conn. Falcon Trace <br />, t S I <br />$800.00 <br />$9.72 <br />$972.00 <br />07c <br />Install 8" HDPE Directional Bore <br />500 <br />LF <br />0.1c <br />install 6" FVC Water Main <br />100 <br />LF <br />$6.00 <br />$600.00 <br />$8.52 <br />$852.00 <br />07b <br />Install 6" HDPE Directional Bore <br />400 <br />LF <br />$38.85 <br />$15,540.00 <br />$12.43 <br />$4 972.00 <br />16a <br />Install SS Wet Tap Assemb. w/ Gate Valve 6" X <br />6" and Tap Main <br />2 <br />EA. <br />$900.00 <br />$1,800.00 <br />$1,400.00 <br />$2,800.00 <br />09 <br />Install Mechanical Restrained Joint DI Fittings <br />1 <br />TON <br />$4,100.00 <br />$4,100.00 <br />$4,100.00 <br />$4100.00 <br />23 <br />Test Holes / Potholes <br />20 <br />EA. <br />$250.00 <br />$5,000.00 <br />2 <br />4 <br />EA. <br />EA. <br />29a <br />Fill,' Pressure Test, Chlorinate, Flush 6" Water <br />Main <br />460 <br />LF <br />$1.50 <br />$690.00 <br />$100LS <br />$100.00 <br />30b <br />Install Sample Point per County Detail, Remove <br />After FDEP Clearance <br />2 <br />EA. <br />$275.00 <br />$550.00 <br />$400.00 <br />$800.00 <br />30c <br />Take Bacterial Sample/Deliver to Lab for Testing <br />4 <br />EA. <br />$150.00 <br />$600.00 <br />91 <br />Mobilization, Demobilization, MOT <br />86a <br />Lawn Restoration Topsoil & Sod (St. Augustine) <br />300 <br />SY <br />$2.25 <br />$675.00 <br />$1.50 <br />$450.00 <br />Subtotal Subtotal Water System Labor and Materials <br />$29,555.00 <br />$14,074.00 <br />91 Mobilization, Demobilization, MOT <br />10% % <br />1 <br />$2,955.50 <br />$4,328.50 <br />Subtotal <br />-1•13TCL"-- <br />Subtotal Water System Labor, Materials, Mob., <br />Demob. and MOT <br />Subtotals for Labor and Materials <br />$32,510.50 <br />$14,074.00 <br />IRCDUS Contingency Account <br />10 1 % <br />$3,251.05 <br />$1,407.40 <br />Subtotals for Labor and Materials <br />814.20 <br />$35,761.55 <br />$15,481.40 <br />TOTAL Labor and Materials <br />$51,242.95 <br />Conn. Between Sunset Dr. SW and Sunrise <br />Dr. SW in (The Bi;hlands <br />Old <br />Install 8" PVC Water Main <br />, t S I <br />$800.00 <br />$9.72 <br />$972.00 <br />07c <br />Install 8" HDPE Directional Bore <br />500 <br />LF <br />$49.85 <br />524 925.00 <br />$12.43 <br />$6,215.00 <br />16a <br />Install SS Wet Tap Assemb. w/ Gate Valve 8" X <br />6" and Tap Main <br />2 <br />EA. <br />$900.00 <br />$1 800.00 <br />$1,500 00 <br />$3 000.00 <br />09 <br />Install Mechanical .Restrained Joint DI Fittings <br />1 <br />TON <br />$4,100.00 <br />$4,100.00 <br />$4,100.00 <br />$4,100.00 <br />23 <br />Test Holes / Potholes <br />20 <br />EA. <br />$250.00 <br />$5 000.00 <br />29a <br />Fill, Pressure Test, Chlorinate, Flush 6" Water <br />Main <br />600 <br />LF <br />51.50 <br />5900.00 <br />$100.00 <br />$100.00 <br />30b <br />Install Sample Point per County Detail, Remove / <br />2 <br />4 <br />EA. <br />EA. <br />$275.00 <br />$150.00 <br />$550.00 <br />$600.00 <br />$400.00 <br />$800.00 <br />30c <br />Take Bacterial Sample/Deliver to Lab for <br />Testi% <br />86a <br />Lawn Restoration Topsoil & Sod (St. Augustine) <br />300 <br />SY <br />$2.25 <br />$675.00 <br />$1.50 <br />$450.00 <br />Subtotal <br />Subtotal Water System Labor and Materials <br />$39 350.00 <br />$15 637.00 <br />91 <br />Mobilization, Demobilization, MOT <br />1 <br />l0% <br />$3,935.00 <br />Subtotal <br />Subtotal Water System Labor, Materials, Mob., <br />Demob. and MOT <br />$43,285.00 <br />$15 637.00 <br />NEM <br />IRCDUS Contingency Account <br />1 <br />10% <br />$4,328.50 <br />$1 563 70 <br />Subtotals for Labor and Materials <br />$47 6.13.50 <br />517,200.70 <br />TOTAL564 <br />814.20 <br />ATTACHMENT 1 <br />