Laserfiche WebLink
t <br /> Ij <br /> CONSENT <br /> INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director CAI-- <br /> THROUGH: Christopher J. Kafer Jr., P.E., County Engine4-. 4e <br /> FROM: Richard B. Szpyrka, P.E., Project Engineer <br /> SUBJECT: AWARD OF BID <br /> 87th Street and 911 Avenue Sidewalk Improvements <br /> IRC Project No. 1205, Bid No. 2015036 <br /> DATE: July 1, 2015 <br /> DESCRIPTION AND CONDITIONS <br /> On March 11, 2015, the Board of County Commissioners entered into a Local Agency Program (LAP) <br /> Agreement FM #431728-1-58/68-01 with the Florida Department of Transportation (FDOT) for the <br /> construction of 6-foot wide concrete sidewalks along the north right of way line of 87th Street from 10111 <br /> Avenue to CR510 and along the east right of way line of 911 Avenue from 79th Street to 87th Street,including <br /> drainage improvements, Swale grading, pavement markings and sodding of disturbed areas in Vero Lake <br /> Estates. Also included in the grant amount are Construction, Engineering and Inspection (CEI) services. <br /> The bid opening for the project was held on May 20, 2015. Seven (7) bids were received and opened. A <br /> detailed bid tabulation is on file and available for viewing in the County Engineering Division. Bid totals are <br /> as follows: <br /> i <br /> Blue Goose Construction, LLC Ft. Pierce, Florida $1,013,267.71 <br /> Kerns Construction & Property Mgmt. Inc. Ft. Pierce, Florida $1,084,854.00 <br /> Timothy Rose Contracting, Inc. Vero Beach, Florida $1,325,094.51 <br /> Douglas N. Higgins, Inc. Ann Arbor, Michigan $1,341,389.90 <br /> Sunshine Land Design, Inc. Stuart, Florida $1,465,010.41 * <br /> Johnson-Davis, Inc. Lantana, Florida $1,490,406.00 <br /> Engecon Construction, Inc. Lake Worth, Florida $1,565,310.15 * <br /> i <br /> *Denotes mathematical errors were found and bid amounts corrected. <br /> Blue Goose Construction, LLC., failed to submit a complete bid package by omitting the required Equal <br /> Opportunity Office form. In addition, per the Contract Documents, Instructions to Bidders Article 3, <br /> Qualification of Bidders: Article 3.01 A requires bidders to have "at least five years" experience in <br /> construction of similar projects of this size and larger. Article 3.01 B requires bidders to have"successfully <br /> constructed, as prime CONTRACTOR, at least three projects similar in scope to this project."The projects <br /> listed by Blue Goose Construction, LLC.,include utility type improvements with no mention of sidewalk work <br /> thus it does not appear that,they have successfully constructed at least three similar project as the prime <br /> CONTRACTOR. Therefore the next lowest bidder Kerns Construction & Property Mgmt. Inc. has been <br /> selected this project.The FDOT concurs with this selection. <br /> F,Puhlic Worksll:NGINELRING DIVISION PROJEC" 'S*1'0i-Vero Lake F- Iatc_Swk-87th Si 101st Ave to CR510 tL.APAAdminra2cnda 80 <br /> ilemsMICC Award of Hid 7-14-15 doe � <br /> I! <br />