Laserfiche WebLink
�l <br /> SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The project consists of constructing a-6' wide concrete sidewalk along the <br /> north right of way line of 871 Street fro TO, Avenue to C.R 10, and along the east <br /> right of way line of 91'1 Avenue from 7r Street to 87"' Street. Also included in this <br /> project will be drainage improvements, swa/e grading, ave en, ma; ings and sodding <br /> of disturbed areas. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the 1Norknunder the Contract Documents may be the whole r <br /> 1 �, 10 <br /> y e o e o only a <br /> part is generally described as follows: <br /> Project Name: 87tt1 Street and 91St�Avenue Sidewalk Improvements <br /> County Bid NU ber: 20 6 <br /> County Project Number: 1205,, <br /> Project Address: 8Street and 91St Avenue, Indian River County, Florida. <br /> Financialoject No.. 43k1728-1-58-01 <br /> ARTICLE 3= ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act,a"s OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 -CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment - <br /> 00520-Agreement(Public Works)FOR LAP PROJECTS ONLY <br /> 00520-2 83 <br /> F'1Public Works%ENGINEERING DIVISION PROJECTSM05-Vero Lake Estates Swk-87th St 101st Ave to CR510(LAP)1Admim%agenda items100520-Agreement(Public <br /> Works)FOR LAP PROJECTS ONLY.doc <br />