Laserfiche WebLink
CONTRACTOR for all things done or furnished in connection with the work <br /> under this Contract and for every act and neglect of the OWNER and others <br /> relating to or arising out of the work. Any payment, however, final or otherwise, <br /> shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Public Construction Bond. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS M. <br /> AN <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRA ...._OR makes the <br /> following representations: <br /> % <br /> A. CONTRACTOR has examined and careful) studied the Contra `, <br /> y ct Documents and the <br /> other related data identified in the Bidding ®ocuments. <br /> B. CONTRACTOR has visited the Site and become familiar with and ispsatisfied as to the <br /> general, local, and Site conditions that ma, affect cost, progress, and performance of the <br /> Work. <br /> C. CONTRACTOR is familiar with an,d.is satisfied as.'to all federal, state, and local Laws and <br /> Regulations that may affect cost, pogress, and performance of the Work. <br /> D. CONTRACTOR has -carefullyysstudied all: reports of explorations and tests of <br /> subsurface conditions at or comt�guous to the Situ and all drawings of physical conditions <br /> in or relating too existingrface or subsurface structures at or contiguous to the Site <br /> (except Under,.ground Facilities) which have been identified in the Supplementary <br /> Conditions as pred'in paragraph 4.02 of the General Conditions and (2) reports and <br /> drawings of a I-lazarrdo`°s Enviro ental Condition, if any, at the Site which have been <br /> identified in the -Supplementary Conditions as provided in paragraph 4.06 of the General <br /> Conditions. <br /> E. CONTRAChas obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional supplementary examinations, investigations, explorations, tests, <br /> studies, and dataacconcerning conditions (surface, subsurface, and Underground Facilities) <br /> at or contiguous to 4'the Site which may affect cost, progress, or performance of the Work <br /> or which relate any aspect of the means, methods, techniques, sequences, and <br /> procedures - onstruction to be employed by CONTRACTOR, including applying the <br /> specific means, methods, techniques, sequences, and procedures of construction, if any, <br /> expressly required by the Contract Documents to be employed by CONTRACTOR, and <br /> safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents. <br /> 00520-Agreement(Public Works)FOR LAP PROJECTS ONLY <br /> 00520-5 g6 <br /> F1Public Works%ENGINEERING DIVISION PROJECTS\1205-Vero Lake Estates Swk-87th St 101st Ave to CR510(LAP)Wdmimlagenda items100520-Agreement(Public <br /> Works)FOR LAP PROJECTS ONLY.doc <br />