My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
07/14/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2015 1:26:27 PM
Creation date
10/19/2015 1:26:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or "Contract"), dated the day of in the <br /> year 20_ by and between Indian River County, a political subdivision of the State of Florida <br /> (hereinafter called OWNER) and (hereinafter called <br /> CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants he set forth, <br /> agree as follows: <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall fuehish and complete <br /> all of the necessary labor, material, and equipment to perform the work as specfi`ed.or indicated <br /> in the Contract Documents. The work is generally described as follows: <br /> A. CONTRACTOR shall complete all work, as specified or indicated in the Contract <br /> Documents. The work is generally described as follows which shall include, but is not <br /> necessarily limited to the following. ; <br /> Indian River County (IRC) proposes to abandon the existing steel package wastewater <br /> treatment plant and replace it with. a new 17,000 gallon per day (GPD) package <br /> wastewater treatment plant. The replacement plant._will be constructed and placed into <br /> operation before the existing plant is abandoned. <br /> The project consists of; but,is not limited to: abandon the existing steel package plant <br /> and replace the plant with a new 17,000 GPD package concrete tertiary wastewater <br /> treatment plant which will include surge_tank, duplex aeration tanks, dual final clarifier <br /> tanks, aerated digester tank, dual cell tertiary filters, and duplex chlorine tanks; and <br /> modification of. the effluent disposal system; provide all necessary electrical equipment <br /> and devices as shown,on. the electrical plans; provide all concrete slabs and site work <br /> shown on the plans; and'-all-other items as required for an operational project. <br /> B. The OWNER shall'have the option of direct purchase of all material and equipment for the <br /> project in accordance with Rule 12A-1.094 of the Florida Administrative Code. The <br /> C. will be responsible for preparing the purchase documents for purchasing by the <br /> owner. The contractor will be responsible for scheduling, receiving, handling, and storage <br /> of all direct purchase material and equipment. <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Masteller & Moler, Inc., hereinafter called ENGINEER, and who <br /> is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3.1 Bidder agrees that the work as generally described herein, will be completed in <br /> accordance with the following timeframe. <br /> 00530-1 ATTACHMENT NO 1 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.