My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/18/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
08/18/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2015 2:34:40 PM
Creation date
10/19/2015 2:33:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/18/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o� <br /> INDIAN RIVER COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> STORMWATER DIVISION <br /> 180127" STREET ORIS p' <br /> VERO BEACH, FLORIDA 32960 <br /> Phone: (772) 226-1562 <br /> TO: Joseph A. Baird, County Administrator <br /> C1111 <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director <br /> AND THROUGH: Vincent Burke, P.E. Utility Director 0 1 <br /> FROM: W. Keith McCully, P.E., Stormwater Engineer <br /> SUBJECT: RELEASE OF REMAINING RETAINAGE FOR WORK ORDER NO. <br /> PCS-1 AND SUBSEQUENT CHANGE ORDERS WITH HYDROMENTIA, <br /> INC. for OSPREY MARSH STORMWATER PARK i <br /> DATE: July 22, 2015 <br /> DESCRIPTION AND CONDITIONS <br /> On September 7, 2010, the County Commission approved Work Order No. PCS-1 with <br /> Hydromentia, Inc. to perform an algal turf scrubber pilot plant study for a full scale algal <br /> turf scrubber system to treat water from Indian River Farms Water Control District's <br /> South Relief Canal and reverse osmosis brine discharge from the South County Water <br /> Treatment Plant. Five subsequent change orders were approved to assist through <br /> project construction. The work under the original Work Order and all change orders is <br /> now complete and acceptable. The purpose of this agenda item is to request the <br /> County Commission to release the remaining final retainage for the original Work Order <br /> and all subsequent change orders. <br /> The amount to be paid to Hydromentia, Inc. is $7,999.28. <br /> ANALYSIS ' <br /> Alternative No. 1 —Approve the payment to Hydromentia, Inc. <br /> Alternative No. 2 — Reject the payment to Hydromentia, Inc. � <br /> F\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda-Consent-Release of Retainage for <br /> Hydromentia WO#PCS-1.doc <br /> 152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.