Laserfiche WebLink
DATE: 03/30/00 <br />FILE: 10.2 <br />�i TYPE: III <br />CLASS: III <br />l7rORIDA EAST COAST RAILWAY NO. OF DAYS: 14 <br />OFFICE OF THE CHIEF ENGINEER AAR / DOT (i: 272159U <br />OF SIGNALS AND COMMUNICATION MILE POST: 212 + 2291' <br />Project Type: FDOT <br />ESTIMATED COST FOR HIGHWAY CROSSING WARNING DEVICES AT CR 505 (ROSELAND ROAD). <br />This estimate should be considered void after one (1) year. <br />MATERIAL <br />UNIT COST <br />UNITS <br />TOTAL COST <br />GATE ASSEMBLIES <br />$4,997.00 <br />4 EA. <br />$19,988.00 <br />GATES <br />$500.00 <br />4 EA. <br />$2,000.00 <br />GATE FOUNDATIONS <br />$575.00 <br />4 EA. <br />$2,300.00 <br />WIRED CASE, 3AB & PMD -3R <br />$38,670.00 <br />1 EA. <br />$38,670.00 <br />BATTERY BOX <br />$675.00 <br />1 EA. <br />$675.00 <br />MISC. GROUND MATERIAL <br />$789.62 <br />1 PKG. <br />$789.62 <br />CONDUIT & DIRECTIONAL BORE <br />$45.00 <br />70 FT. <br />$3,150.00 <br />BATTERIES <br />$200.00 <br />30 EA. <br />$6,000.00 <br />CABLE <br />$7,500.00 <br />1 PKG. <br />$7,500.00 <br />MISCELLANEOUS RELAY EQUIP <br />$1,120.00 <br />1 PKG. <br />$1,120.00 <br />POWER SERVICE <br />$900.00 <br />1 EA. <br />$900.00 <br />MONITORING EQUIPMENT <br />$5,422.00 <br />1 PKG. <br />$5,422.00 <br />SANITATION & DISPOSAL <br />$1,500.00 <br />1 PKG. <br />$1,500.00 <br />FREIGHT & HANDLING <br />$13,277.00 <br />TAX @ 6.5% <br />$5.753.00 <br />TOTAL MATERIALS <br />$109,044.62 <br />EXCAVATING EQUIPMENT PER DAY <br />$181.00 <br />14 DAYS <br />$2,534.00 <br />EQUIPMENT RENTAL PER DAY <br />$125.00 <br />14 DAYS <br />$1,750.00 <br />FOREMAN'S TRUCK PER DAY <br />$35.00 <br />14 DAYS <br />$490.00 <br />GANG TRUCK PER DAY <br />$63.00 <br />14 DAYS <br />$882.00 <br />SUPERVISORS TRUCK PER DAY <br />$35.00 <br />14 DAYS <br />$490.00 <br />EQUIPMENT TOTAL <br />$6,146.00 <br />ENGINEERING <br />$4,500.00 <br />1 <br />$4.500.00 <br />ENGINEERING TOTAL <br />$4,500.00 <br />CONSTRUCTION SUPERVISION <br />$266.00 <br />14 DAYS <br />$3,724.00 <br />LABOR ADDITIVE <br />$2.074.00 <br />SUPERVISION TOTAL <br />$5,798.00 <br />LABOR PER DAY <br />$1,035.40 <br />$14,496.00 <br />NUMBER OF DAYS <br />14 <br />LABOR ADDITIVE <br />$8.460.00 <br />TOTAL LABOR <br />$22,956.00 <br />GANG EXPENSES PER DAY <br />NUMBER OF DAYS <br />TOTAL GANG ZXPZNSES <br />$553.00 <br />14 <br />$7,742.00 <br />SUB—TOTAL $156,186.62 <br />CONTINGENCIES 5% $7,809.00 <br />TOTAL $164,000.00 <br />rrsis9u.x►. <br />