Laserfiche WebLink
• <br />amount of silt that accumulated in our Swale. The silt alone was previously causing <br />blockages in the swale Now, in some cases, sod was placed over the silted areas causing <br />further degradation of the conveyance capabilities of the Swale These deficiencies are <br />causing ponding in the rear yards of many of our residents. The excess standing water is <br />damaging our resident's sod as well as continuing to disrupt routine maintenance cf our <br />yards Also, there are large areas of the berm's back slope that have not been soded- <br />Some of these areas appear to be strips that were missed, while others are nowherd near <br />completion. <br />Although the sod, which has been installed, bas prevented further sihaion of the sale, <br />the placement of sod without removing the silt has not restored our swale to an <br />acceptable condition that previously existed The "quick fix" to our previous req st has <br />not met our expectations nor corrected the conveyance problems, which now exist the <br />swale. The conveyance problems in our swale would not have occurred if all of <br />proper permits were obtained and had proper erosion control measures been install <br />prior to commencement of construction. Within two weeks of receipt of this letter - <br />expect that our swale will be restored to the condition that existed prior to the <br />commencement of your project If is not corrected or a reasonable schedule is not agreed <br />upon, our only recourse will be to report this issue to Indian River County South Florida <br />Water Management District, Florida Department of Environmental Protection and US <br />Environmental Protection Agency to ensure that any Certificate of Occupancies yoi1 <br />request are held until our swale is restored to our satisfaction. Furthermore, we re re <br />that you have the center line of the swale surveyed and a solution is engineered to e ure <br />positive conveyance from the south end of the swale to its terminus at the 5th Street W <br />canal. The existing sod should be removed and the back slope regraded where n <br />The sod should then be replaced such that there are no gaps between the existing in <br />our resident's back yards through the swale to the top of the berm. The above tunel e <br />and approach should be easily accommodated now while your landscape crews and <br />earthwork equipment are still mobilized on-site. <br />Frolandscaping that hu been installed thus far, it is apparent that when coinpteted <br />yo .. velopment will be an attractive place for your residents. We are simply <br />ng that the appearance of our resident's back yards be restored to the sortie quality <br />the i • steel pnor to your construction. Once again, we hope that this issue can Se <br />-. with out the involvement of all agencies described above. However, Or <br />rest.. -fi�tt have accommodated these issues ftr too long and we are insistent that Our <br />conir" s be addressed wit in the next two weeks thereby restoring the quality of,life our <br />resi an - Lad prior to the construction of your project. <br />Sho�ild <br />rec +* <br />Sin <br />you have any questions regarding this letter, please contact me immediately upon <br />-• `63-9486. <br />X2....‘i <br />Kevin Oberlink <br />C ?resident <br />• <br />CC:j John Tippen <br />CotOtyl Commissioner <br />October 15, 2002 <br />17 <br />6i <br />it <br />