Laserfiche WebLink
At its regular meeting of August 22, 2000, the Board of County Commissioners granted PD special <br />exception and conceptual PD plan approval for The Seasons project. That approved PD special <br />exception plan provides for 100 residential units on 37.20 acres, resulting in a density of 2.70 units <br />per acre. The developer is now requesting a modification to a project setback No increase in the <br />number of lots or density is proposed, and no changes to any approved project parameters, layout, <br />or conditions are proposed. The August 22, 2000 staff report for the Seasons project is attached <br />(attachment #3). That report accurately represents all aspects of the approved project, except for the <br />requested setback modifications. <br />As approved, the conceptual PD plan requires a 7.5' side yard setback for screen enclosures on lots <br />located along the north property line and a 5' side yard setback for screen enclosures for all other <br />lots. The applicant is requesting a 0' side yard setback for screened pool enclosures attached to <br />courtyard homes on any lots. Pursuant to PD ordinance section 915.26, a setback which was <br />approved as part of a conceptual PD plan may be reduced only through approval of a modified <br />conceptual plan. Such a modification requires special exception approval. <br />PLANNING & ZONING COM1VIISSION ACTION: <br />At its regular meeting of September 12, 2002, the Planning and Zoning Commission voted 3 to 1 to <br />recommend approval. That motion failed because 4 affirmative votes are required by the Planning <br />and Zoning Commission to pass a vote.. <br />The Board is now to approve, approve with conditions, or deny the special exception use request. <br />Pursuant to Section 971.05 of the LDRs, the Board is to consider the appropriateness of the <br />requested use for the subject site and surrounding area. The Board may attach any conditions and <br />safeguards necessary to mitigate impacts and to ensure compatibility of the use with the surrounding <br />area <br />ANALYSIS: <br />To change the project's approved setbacks, the applicant must modify the currently approved <br />conceptual PD plan. Because no design changes are involved in the request, no project design <br />revisions are needed Consequently, no changes are proposed to the existing subdivision <br />improvements. <br />Under the currently approved PD plan, screen enclosures for courtyard homes must be set back 7.5' <br />when located on the north perimeter lots and 5' on all other lots. The applicant is requesting that <br />screen enclosures for all courtyard homes (on any lot) be allowed to have a 0 side yard setback. This <br />request would affect any lots on which a courtyard home is constructed. A courtyard home has a <br />pool located in the middle (front/back) of the lot with a 6' wall constructed along a side property line <br />to provide privacy for the pool area The 0' setback will allow the applicant to extend the screen <br />enclosure to the 6' privacy wall. That same wall would "buffer' the adjacent lot from the screen <br />enclosure and pool area. <br />The following table compares parameters of the RM -6 district, and the proposed PD plan setback <br />changes: <br />October 8, 2002 <br />28 <br />By 1 e 6' <br />