My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/2001
CBCC
>
Meetings
>
2000's
>
2001
>
1/9/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 3:26:11 PM
Creation date
9/25/2015 4:10:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
01/09/2001
Archived Roll/Disk#
2235
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the subject property and she was in favor of it . <br /> It was determined that no one else wished to be heard and the Chairman closed the <br /> public hearing . <br /> Vice Chairman Stanbridge had difficulty envisioning the height of this project , and <br /> Director Boling advised it could be built up 35 feet from the lowest structural point . <br /> Chairman Ginn was concerned about how the garage will look , and Mr . Large <br /> explained that strong foundations would be approximately 3 to 3 - 1 /2 feet above ground with <br /> a concrete floor for the cars . The soil under the structures will be removed and replaced with <br /> sand to provide for better percolation . He advised he had built stilt houses in St . Christopher <br /> Harbor in the 1970 ' s . <br /> Mr. Mosby added that the plan includes mounding up the driveway and the <br /> stormwater retention will be under and around the structure . <br /> MOTION WAS MADE by Commissioner Tippin , SECONDED <br /> by Commissioner Adams for discussion , to approve staff' s <br /> recommendation . <br /> Under discussion , Commissioner Adams believed that a lot of the concerns relate to <br /> the actual site plan because the Board was unable to envision how it will look . <br /> Director Boling advised that another level of scrutiny in the process will be at the land <br /> development permit stage ; the elevation views will be required then . Engineering and <br /> drainage will be reviewed by Public Works later in the process . <br /> Public Works Director James W . Davis felt at this point it is a feasible concept from <br /> his point- of- view . The key is the soil exchange for well - draining soils . Staff and SJRWMD <br /> staff will review this aspect carefully and pay particular attention to a 3 - day storm event <br /> January 9 , 2001 <br /> J0 <br /> B I / U <br />
The URL can be used to link to this page
Your browser does not support the video tag.