My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/2001
CBCC
>
Meetings
>
2000's
>
2001
>
1/9/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 3:26:11 PM
Creation date
9/25/2015 4:10:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
01/09/2001
Archived Roll/Disk#
2235
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Upgrade Svstem Upgrade / Phase Description Estimated <br /> Priority / Phase Costs ( S ) <br /> Phase I. NORTH COUNTY REVERSE OSMOSIS <br /> i Upgrade the Human Machine Interface (HMI) terminal and software with the latest version of Rockwell <br /> Software ( RS- VIEW ) for the North County RO. High Service Pumps station. Currently, the existing <br /> terminal and software is not compatible with other plant (North and South Reverse Osmosis ) systems <br /> A Equipment, programming, and startup services for replacement of the Existing HMI at North Countv <br /> Reverse Osmosis . (Estimated Cost 513 , 134 - R&R Fund ) <br /> B Remove existing Panel view monitor and modify control panel for new Unit converts existing <br /> application and integrate plant wide screens. (Estimated Cost 54 , 950 - R&R Fund ) <br /> i Miscellaneous Computer hardware and penphery upgrades as determined by Computer Services Dept . <br /> ( Estimated Cost 525 ,000 — 50% Capacity Charge Fund / 500/6 R&R ) <br /> Contingencv at approximately 10% to be utilized as approved by the Director of Utilities. <br /> Total Estimated Cost ( rounded) 1 S47, 500 <br /> Phase II. MAIN PLANTS. <br /> i Upgrade the six ( 6 ) System HMI packages to latest version Allen Bradley — RS — View Software . The <br /> current software version being utilized is 6. 00.41 . The current and latest revision is 6 . 30 . This software <br /> upgrade will eliminate some nuisance errors currently being experienced by the operators. <br /> Estimated Cost ( 6 x 52, 850 = S17, 100 - R&R Fund) <br /> Upgrade the telephone leased lines modems at both plants to handle a high transfer rate to 19,200 bites <br /> per second (BPS ). The current modems are 9600 BPS . This upgrade will reduce plant operator ' s system <br /> wait time. <br /> Estimated Cost (2 x 51 ,310 = $2 ,620 - R&R Fund) <br /> i Add Allen Bradley communication modules (computer cards ) at both plants to bridge the independent <br /> Data Highway (DH) networks. <br /> Estimated Cost ( 2 x 53 ,410 = S6 ,820 - Capacity Charge Fund) <br /> r Meree North and South Reverse Osmosis HMI applications ( computer screens ) to provide control of both <br /> plants from either location. <br /> Estimated Cost ( 2 x 520 ,000 = $40 ,000 - Capacity Charge Fund ) <br /> r Enhance application and system performance errors as outlined by the operators at both plants . <br /> Estimated Cost (2 x 551000 = S101000 - Capaciry Charge Fund) <br /> r Miscellaneous Computer hardware and periphery upgrades as determined by Computer Services Dept. <br /> ( Estimated Cost $25 ,000 — 50% Capacity Charge Fund / 50% R&R ) <br /> Y Contingency at approximately 10% to be utilized as approved by the Director of Utilities <br /> Total Estimated Cost ( rounded) 5111 ,7011 <br /> Phase III. REMOTE SITES: <br /> Upgrade the current Allen Bradley Radio Telemetry Units (RTU) to Allen Bradlev model Slick-500 <br /> ( SLC-5/03 units & upgrade communication protocol to Modbus ) This replacement will modernize the <br /> system & eliminate obsolete equipment. Modbus protocol is the preferred method for radio <br /> communication, because of its structural simplicity. <br /> A Roseland Elevated Storage Tank Site equipment replacement. Estimated Cost S10,500 — R&R Fund <br /> B. Grand Harbor Re-pump Station system upgrade. Estimated cost 11,200 — R&R Fund <br /> C . Gifford Elevated Storage Tank Site system replacement. Estimated cost S10,500 - R&R Fund <br /> D. Kings Highwav Elevated Storage Tank Site system replacanent. Estimated cost S 10,500 - R&R Fund <br /> E. Highway 510 / 512 Pressure Station system Estimated cost $4200 - Capacity Charge Fund <br /> F. Sebastian Pressuue Monitoring Station. Estimated cost $4200 - Capacity Charge Fund <br /> r Contingency at approximately 10% to be utilized as approved by the Director of Utilities . <br /> Total Estimated cost ( rounded ) 548,500 <br /> Total Estimated Project Cost S207,700. 00 <br /> January 9 , 2001 <br /> B � 3 U � <br />
The URL can be used to link to this page
Your browser does not support the video tag.