My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/14/2000
CBCC
>
Meetings
>
2000's
>
2000
>
11/14/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:16:49 PM
Creation date
9/25/2015 5:46:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
11/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANA! YS!S <br />Purchasing Procedures; Justification <br />County Code Chapter 105, Purchasing. sets forth bidding procedures and requires Board approval for the <br />purchase of materials or services exceeding S5.000. Code Section 105.03 provides that bidding is not <br />required for projects costing more than $5.000, except for certain projects specifically requiring bidding <br />under Florida Statutes (which is not applicable in this case). <br />Since the construction costs do not exceed $5,000 Board approval is technically not required for the <br />proposed improvements. Notwithstanding, staff thinks it is appropriate to bring this item to the Board for <br />consideration. Regarding selection of a contractor, staff's position is that it is appropriate and in the County's <br />interest to select the services of Summerlin's Seven Seas for construction of the improvements without need <br />for formal bidding, based on the following reasons. First, from past experience regarding similar structures <br />associated with other county projects, Summerlin's price has been reasonable. Second, Summerlin's Seven <br />Seas has consistently been the low bidder and has done competent work in a timely manner in past marine <br />construction county bid projects (e.g , Round Island Park boardwalks and tower; Donald McDonald Park <br />boardwalk/pier). As previously explained, the County contracted with Summerlin's Seven Seas for <br />construction of other marine structures on the ORCA property, and there is an opportunity to amend that <br />contract to include the ground -level boardwalk and ditch crossing. <br />Contract <br />The Addendum is structured similar to the ongmal contract with Summerlin's Seven Seas. The Addendum <br />specifies that the ground -level boardwalk and ditch crossing must be completed by January 8 2001. The <br />Addendum also provides that payment to the contractor will be in one lump sum, but only after the <br />construction work is inspected by county staff and found to be satisfactorily completed. <br />Since the work consists of small structures that will be constructed in a matter of weeks, and payment will <br />be in one lump sum vs. a series of payments, the Addendum waives construction and payment bonds that <br />were required for previous work under the onginal contract agreement. <br />Funding <br />Staffs position is that the appropriate funding source for the proposed construction work ($2,600, matched <br />by the $2,400 Greenways grant) is the County's native upland "fee -in -lieu of set-aside" account. The <br />referenced account (# 127-000-343-071.00) pertains to monies received by the County for fees -in -lieu of <br />native upland set -asides, as required in the County's Land Development Regulations for development <br />Habitaten <br />projects (greater than five acres) in native upland areas County Code Section 929.05(3) Upland <br />Protection, provides that such funds are intended for the County to use acquire conservation land or to use <br />for the management of county acquired conservation lands. Therefore, since the proposed construction relates <br />to conservation land management, the funds are appropriate for use for this project. _ <br />RECOMMENDATION <br />Staff recommends that the Board of County Commissioners approve the attached Addendum 2 to Agreement, <br />and authonze the Board Chairman to execute said document <br />NOVEMBER 14, 2000 <br />-109- <br />BK 116 PG 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.