My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/14/2000
CBCC
>
Meetings
>
2000's
>
2000
>
11/14/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:16:49 PM
Creation date
9/25/2015 5:46:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
11/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
survey services based on the most favorable quote, in preparation for the special assessment <br />project, as recommended by staff. The Department of Utility Services staff has completed design. <br />We are now ready to begin the assessment process associated with this project (See attached <br />EXHIBIT 1 -agenda item and minutes of the above referenced meeting, -EXHIBIT 2- Plat Map <br />and EXHIBIT 3 -Estimated Project Cost). <br />ANALYSIS <br />There are 12 platted residential lots, which may benefit from this proposed water line on 28th <br />Court SW. The petition has been signed by 10 of the 12 owners (83%). The lots are 0.53 acre. <br />The attached map displays the area to benefit from the assessment project The 2 lots abutting <br />5th Street were provided water service in the Phase I Water Project, which was completed on <br />January 12, 1993 and are not included (see attached EXHIBIT 2- Plat Map). Of the 17 <br />subdivisions along 5th Street SW, between 27th and 43rd Avenues, the installation of County <br />water service in Westwood Subdivision will leave just one subdivision in this area without County <br />water. <br />Indian River County s Comprehensive Plan states, "The County's water system shall be expanded <br />to supply the potable water needs of the eastern half of the County during the period 1986- <br />2005.' (See attached EXHIBIT 5, page 4 of the Potable Water Sub -element, and page 22 of the <br />Sanitary Sewer Sub -element). This project is to be paid through the assessment of property <br />owners along the proposed water line route. In the interim, funding will be from the Assessment <br />Fund No 473-000-169-389.00. <br />28th Court in Westwood Subdivision is a private street, with a provision in the certificate of the <br />subdivisions plat dedication requinng a formal acceptance of the streets and/or easements, or any <br />part thereof, by the County. Staff will prepare for execution a resolution of acceptance of the <br />streets and/or easements, "for utility purposes only", on the consent agenda, prior to the public <br />hearing and presentation of Resolution III, for this project. <br />Attached are Resolutions I and II for the assessment project. The total estimated project cost and <br />amount to be assessed; including engineering and administration is $49 261 00 The estimated <br />assessment cost per square foot is $0.177794 (rounded) (See attached EXHIBIT 4 -Assessment <br />Roll). <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve the attached resolutions, which approve the preliminary assessment roll <br />and establish thepublic hearing date. <br />LIST OF EXHIBITS: <br />Exhibit -1. BCC minutes June 13, 2000 <br />Exhibit -2. Plat Map <br />Exhibit -3. Estimated Project Cost <br />Exhibit -4. Preliminary Assessment Roll <br />Exhibit -5. Page 4 Potable Water Sub -element <br />NOVEMBER 14, 2000 <br />-115- <br />BK1I6PG127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.