Laserfiche WebLink
ANALYSIS <br />There are 12 platted residential lots, which may benefit from this proposed water line on 281 Court <br />SW. The 10 owner's signatures. on the petition represent 83 % of the 12 lots supporting this <br />project. The 2 lots abutting 5° ST. SW were provided service in the Phase I Water Project, which <br />was completed 1-12-93 and are not included. (see attached Exhibit 3 - Schedule): Of the 17 <br />subdivisions along 5d' Street SW, between 2? and 43rd avenues. the installation of County water <br />service in Westwood Subdivision will leave just one subdivision without County water ! <br />28" Court in Westwood Subdivision is a private street, with a provision in the certificate of plat <br />dedication requiring a formal acceptance of the streets and/or easements. or any pan thereof, by the <br />County. Staff will prepare for execution a resolution of acceptance of the sweets and/or easements, <br />" for utility purposes only' , on the consent agenda, pnor to the public hearing and presentation of <br />Resolution I1I, for this project. <br />The properties are typically 0.53 of an acre. The attached map (EXHIBIT -1) displays the aretto <br />benefit from the assessment project. <br />This protect is to be paid through the assessment of property owners alone the proposed water line <br />route. Funding will be from the assessment fund No. 473. Design services will be provided by the <br />Department of Utility Services. <br />RECOMMENDATION <br />The staff of the Deparmient of Utility Services recommends approval of the above -listed project, <br />and requests authorization for the Department to proceed with the design engineenng work and <br />award a contract for survey services based on the most favorable quote. in preparation for the <br />special assessment project. <br />JUNE 13, 2000 <br />ON MOTION by Commissioner Ginn, SECONDED <br />by Commissioner Tippin, the Board unanimously <br />approved the project and authorized staff to proceed <br />with the design engineering work and award a <br />contract for survey services based on the most <br />favorable quote, in preparation for the special <br />assessment project, as recommended by staff. <br />NOVEMBER 14, 2000 <br />-41- BOOK i <br />-121- <br />BK 116PG133 <br />