My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2000
CBCC
>
Meetings
>
2000's
>
2000
>
12/12/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 4:30:59 PM
Creation date
9/25/2015 5:47:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
12/12/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.a,ALI"Siff <br />There are 1 � platted residential lots. which may beneftt from this prape�scd water line on �8'h <br />Court SUS'. The petition has been signed b}� 10 of the 1? owners (8 � ° �:t. The lots are .� � :acre. <br />fhe attached map displays the area to benetit ti•om the assessment prui�ct. Che' lots abutting <br />�`h Street were provided water sen•ice in the Phase 1 Water Project. which was completed ��n <br />.}anuar� t`_'. l�)N3 and are not included, i see attached EXHIBIT_- Plat tap). taf rite I? <br />>ubdivisions al�}n<.; �''' Street SVk _between _'7'" and -t �"' Ai emus_ the installation c}f Count <br />water service in L4'estwoad Subdivision will leave just Vv'est Side Subdivision in this area <br />without County water <br />Indian River County's Comprehensive Plan states. "The Count}•'s water system shall be <br />expanded to supply the parable water needs of the eastern half of the County• during the period <br />1986-'_UU�.�� {See attached Exhibit S. page -! of the Potable V��ater Sub -element. <br />This project is to be paid through the assessment of property owners alon_ the proposed water <br />line route. In the interim. fundin�� will be from the Assessment Fund No.-17�-ODU-16y-X89.00. <br />The total estimatc;d project cast and amount to be assessed, including engineering_. construction <br />and administration is $-}9'61.UU. The estimated cost per square foot is $ U.177794 {rounded}. <br />(See attached Exhibit -I- Assessment Roll>. <br />REC0�1`IEVD.-�TIOti <br />The staff of the Department of [hility Services recommends that the Board of County <br />Commissioners approve the attached Resolution III. which at'fitirts the preliminary assessment <br />roll on the subject propem. <br />LIST OF EXHIBITS <br />1-13CC implementation tiovember 1-t__'UUU <br />Z -Plat ititap <br />-Es[imated Praiect Cost & Summary Schedule of Properties <br />4-Preliminan• Assessment Roll <br />-Paee �i Potable 1�'ater Sttb-element <br />December 12, 2000 <br />BK I 1 � PG <br />(-� a � 74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.