My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/13/2001
CBCC
>
Meetings
>
2000's
>
2001
>
2/13/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:21:22 PM
Creation date
9/25/2015 4:12:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
02/13/2001
Archived Roll/Disk#
2275
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. <br />Lots I Parcel I.D. <br />Nos./ <br />Homes <br />III -A UW -97 -16 -DS 891 1786 / 384 <br />i <br />1 III -B Uri' -97 -17 -DS 530 458 / 239 <br />III -C UW -97 -18 -DS 900 822 / 402 <br />III -D UW -97 -19 -DS 698 639 / 232 <br />III -E UW -97 -20 -DS 1 735 654 / 276 <br />Total 13,754 3,359 /1,533 <br />Locations <br />ALL OF PHASE III IS SOUTH OF CR 512 & <br />SOUTHWEST OF BARBER STREET <br />South of Caravan Terrace with Periwinkle Drive <br />along the South & West <br />East of Laconia St.& West of Shakespeare St.. <br />Between Crystal Mist & Lanfair Ave's <br />IBetween Laconia & Barber St's , between Bayfront <br />Terrace and Rolling Hills (Lansdowne) <br />East of Laconia St. between Clearmont & Capon <br />Streets. <br />West of Laconia St, between Granduer & Gladiola <br />Avenue's <br />South of CR 512 and SW of Barber Street <br />Engineering design has been completed by the staff of the Department of Utility Services for Phase III -B <br />and we are now ready to begin the assessment process associated with this project, as outlined herein. A <br />summary assessment roll for Phase III -B is attached (Attachment 4). The full assessment roll is on file in <br />the commission office. This project is to be paid through the assessment of property owners along the <br />proposed water line route Financing will be from the assessment fund 473, account number 473-000-169- <br />489. If needed, inter -fund borrowing will be available from the capacity fee fund 472. The estimated <br />project cost and amount to be assessed for Phases III -B is $ 1,335,742.80 (rounded) (Attachment -5). The <br />estimated cost per square foot is $0.242354 (rounded). The actual assessed cost, as with any project will <br />be determined based on actual competitive bid prices <br />On January 26, 2001, a letter was sent to the City Manager, of the City of Sebastian, with a copy of a draft <br />agenda item and a map of the project area (Attachment 6). <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County Commissioners <br />approve the attached Resolutions I and II and set the public hearing date. <br />LIST OF ATTACHMENTS: <br />1 -June 18, 1996 BCC minutes <br />2 -October 24, 2000 BCC minutes <br />3 -Map of Project area <br />4 -Summary assessment roll <br />5 -Estimated Project cost <br />6 -Letter to City of Sebastian <br />ON MOTION by Vice Chairman Stanbridge, SECONDED 13Y <br />Commissioner Adams, the Board unanimously adopted <br />Resolution No. 2001-016 providing for the Sebastian Area <br />Phase III -B Water Expansion (an area east ofLaconia Street and <br />west of Shakespeare Street between Crystal Mist and Lanfair <br />Avenues in the city of Sebastian); providing the total estimated <br />cost, method of payment of assessments, number of annual <br />installments, and description of the area specifically served. <br />February 13, 2001 <br />141 <br />8K117PG153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.