Laserfiche WebLink
Trade approximately ;% acre((#3)M3), for % acre ((#2)M3'. Kirrie will quit <br />claim ((41413) to Indian River County for the purpose of mitigation as <br />needed. See Attachment ((113)113) <br />Kirrie will provide engineering and will construct 130`x' Street to the new <br />access at ((#2)*13). <br />Indian River County will: In conjunction with the City of Sebastian, process <br />the modification of the HCP and ITP plans and permits. Re: letter of Aug. <br />24, 2000 City of Sebastian indicates the need for modifications to the ITP, cc <br />Mike Jennings, Roland Deblois, Ruth Stanbridge, Fran Adams, due to <br />outparcels in conserve area and airport issues. <br />The construction of the road, on the approximately 870' of 130th Street <br />right -of -wary, will be done by Mr. Kirrie, modification of the I.T.P./H C. P. <br />will be a joint effort between Indian River County and the City of Sebastian. <br />Any private entities or groups (other than recognized conservation groups) <br />using the Kirrie constructed portion of 130th Street, shall reimburse Mr. <br />Kirrie through the county on a fair share based on the final cost of <br />construction. <br />lr. Kirrie will fence that portion of 130th Street and the new access ((2)M3) <br />from the gate south at such a time as the rest of the IVSCA is fenced <br />Mr. Kirrie will connect to sewer & water at the time it comes to the 129th <br />Street boundary of the Sembler tract. <br />Mr. Kirrie will contribute $2,500.00 to help offset the costs ofITP/HCP <br />permit modifications. The City of Sebastian and Indian River County, I <br />believe, are going to have to amend the above mentioned permits, due to <br />FAA restrictions, Re: ITP/HCP at the Sebastian airport. Since the above <br />dation will be ongoing, the minor portion (130th Street access) of the <br />modification can be incorporated at a cost, less than that of a separate <br />action. <br />FEBRUARY 19, 2002 <br />c <br />i <br />-42- <br />