Laserfiche WebLink
0 0 <br />14.B.3. ENGINEERING SERVICES FOR DESIGN, PERMITTING AND <br />CONSTRUCTION FOR THE CLOSURE OF SEGMENT 1 SIDE SLOPE OF THE CLASS <br />1 LANDFILL <br />ON MOTION by Vice Chair Bowden, SECONDED by Commissioner <br />Davis, the Board unanimously approved and authorized the Chairman to <br />sign Work Order Number 6 authorizing GeoSyntec to provide <br />engineering services necessary for the closure of the side slope of <br />Segment 1 and development of design drawing and construction phasing <br />plan for the landfill gas control system expansion in accordance with the <br />scope of services and schedule for a not to exceed budget of <br />$206,113.00, as recommended in the memorandum of January 23, 2007. <br />PROPOSAL IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />14.B.4. THREE-YEAR TERM CONTINUATION OF GROUNDWATER MONITORING <br />AT SOUTH GIFFORD LANDFILL SITE <br />6 <br />• <br />ON MOTION by *Vice Chair Bowden, SECONDED by Commissioner <br />Flescher, the Board unanimously approved GeoSyntec's proposal and <br />authorized the Chairman to execute Work Order Number 7 in the not to <br />exceed amount of $199,445.00, as recommended in the memorandum of <br />January 17, 2007. <br />WORK ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />14. C. ENVIRONMENTAL CONTROL BOARD - NONE <br />February 20, 2007 <br />S.W.D.D. <br />3 <br />