Laserfiche WebLink
The Department of Utility Services staff has completed design of the water distribution <br />sy stem. <br />ANALYSIS <br />Of the 16 platted residential lots on 32" Terrace, the two (2) lots abutting 8th Street were <br />included in a prior water assessment project and are not included 'n this project. The 7 owners <br />signing the petition (including one (1) temporary service agreement) requesting the <br />installation of the county water system represent 50 °/% of the owners requesting county water. <br />(See ATTACHMENTS: 1 - Plat map which displays the area to benefit from the assessment <br />project, and 3 - Schedule of Properties)_ <br />This project is to be paid through the assessment of property owners along the proposed water <br />line route. Funding will be from the Assessment Fund No. 473. Typical lot sizes are 1.10 <br />acre. The two (2) largest lots at the South end of the street are 1.28 Sr 1.34 acres respectively, <br />and unlike the other lots, there is no piping running past or in front of these two lots. Staff <br />proposes a maximum assessment of 1.10 acres for any lot in this subdivision as an <br />equalization. <br />The total estimated project cost, and amount to be assessed, including engineering, <br />administration and construction is an estimated $ 47.07324. The estimated cost per square <br />foot is $ 0.070264 (rounded). (See ATTAC(-IMENT- 4 Estimated Project Cost (Cr Preliminary <br />Assessment Roll) <br />RECOMMENDATION <br />The staff of the Department of Utility Services <br />Commissioners approve the attached resolution III, <br />roll on the subject property. <br />LIST OF ATTACHMENTS: <br />1. Plat Map <br />Implementation ofJanuary 8, 2002 BCC meeting <br />3. Schedule of Properties / Summary Assessment <br />4. Estimated Project Cost & Preliminary Assessment Roll <br />recommends that the Board of County <br />which affirms the preliminary assessment <br />FEBRUARY 5, 2002 <br />-36- <br />