Laserfiche WebLink
Date: January 29, 2002 <br />To: The Honorable Board of County Commissioners <br />Thru: James E. Chandler, County Administrator <br />From. Thomas W. Frame, General Services Director j <br />Subject: Library Needs for Gifford Youth Activity Center <br />BACKGROUND: <br />At the last Public Library Advisory Board Meeting, staff was directed to place the issue of furnishing the <br />Gifford Youth Activities Center (GYAC) with necessary furnishings, books and connection to the <br />County's fiber optic network. <br />Currently located within the Gifford Youth Activities Center is an area that was designated to provide <br />library services particularly for the youth of the community. If fully stocked with complete collections, <br />there could be 900 books for children and 3,000 books for young adults. If fiber optics were made <br />available to the facility, the center would have access to the complete on-line reference resources <br />available to the County's library system in addition to the printed collections. That reference data base is <br />subscribed from the Gale Group on-line services for an annual cost of over S83,000. <br />In addition to stocking of books and extension of fiber optics into the facility, another need that has to be <br />addressed is the furnishing. The attached floor plan shows the basic layout of the space to be utilized <br />along with the proposed furnishings. <br />To accomplish the needs of the Gifford Youth Activities Center, there are several options that could be <br />considered by the Board. <br />OPTION I. <br />Furnishings <br />Furnishings at the library are purchased through a vendor that has a State contract. That vendor, R. <br />George Si. Associates, Inc., can provide all new furnishings shown on the floor plan for a total of <br />S35.596.27. <br />Fiber Optic Connections <br />Currently, the fiber optic network runs adjacent to the site and could be easily extended into the site to be <br />connected to both the Youth Activities Center and the Aquatics Center. The primary cost is the extending <br />of the cable itself into the site. The connection of electronics is only minor in comparison. If both the <br />Youth Activities Center and the Aquatics Center were connected, the estimated cost would be 510,905. <br />Books <br />To provide a ready to go collection of books, it is desirable to obtain shelf ready" books. This means <br />that the processing of the books has already been performed and does not require any additional <br />processing by the library's technical staff. To provide a collection that is felt to be very adequate, the <br />following has been suggested: <br />Children's — 900 books at an average of S20 per book S13000 <br />Young Adult's — 3.000 books at an average of S20 per book 560.000 <br />Total S-5.000 <br />FEBRUARY 5, 2002 <br />