My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/13/2001
CBCC
>
Meetings
>
2000's
>
2001
>
3/13/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 10:19:33 AM
Creation date
9/25/2015 4:15:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
03/13/2001
Archived Roll/Disk#
2275
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At its reLular meeting of August 24, 2000,the Planning and Zoning Commission granted <br />preliminary PD plan plat approval for the Central Village Plat 2. Subsequently, a land <br />development permit was issued for the proposed development. At this time, all of the required <br />improvements have been completed, with the exception of some internal sidewalks and the <br />seeding and mulching of a retention area. The owner. Pointe West of Vero Beach, LTD, through <br />its went, On Site Management, Inc.,is now requesting final plat approval and has submitted the <br />following: <br />1. A final plat in conformance with the approved preliminary plat, and <br />2. A certificate of completion for the required improvements, and <br />3. A contract for the required remaining sidewalk improvements, and <br />4. A contract for the remaining required seeding and mulching, and <br />5. An engineer's cost estimate for the remaining sidewalk and seeding and mulching <br />improvements. <br />ANALYSIS: <br />At this time, all required improvements have been completed with the previously noted <br />exceptions. The applicant has warrantied the utility improvements via a utilitv service bill of <br />sale. The cost estimates for the sidewalk and seeding and mulching of the retention have been <br />approved by the County Engineering Department. The sidewalk improvement will be secured b% <br />a letter of credit and the seeding and mulching will be secured by a cash bond. These final <br />security arrangements have been approved by the County Attornev's Office. In addition. the <br />contracts for required improvements have been approved by the attorney's office. Therefore. all <br />applicable requirements regarding final plat approval have been satisfied. <br />RECOMMENDATION: <br />Based on the above analysis, staff recommend that the Board of County Commissioners grant <br />final plat approval for Pointe West Central Village Plat 2, authorize the chairman to sign the <br />contracts for construction, and accept the letter of credit and cash bond that secure the contract . <br />MARCH 13, 2001 <br />P� L� 21 <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.