Laserfiche WebLink
11 <br />S - <br />The Board reviewed a Memorandum of March 7, 2001: <br />DATE: March 7, 2001 <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THRU: James E. Chandler, County Administrator <br />FROM: Thomas W. Frame. General Services Director <br />SUBJECT: Bid Authorization for Additions to Main and North County Libraries <br />BACKGROUND: <br />On May 23. 2000, a presentation was made by General Services concerning the amount of funding <br />necessary for the expansion of both the Main Library and North County Library. When originally funded. <br />there were also funds set aside for the new West County Library to be built at the Mueller Center. <br />As architects for both the Main Library and the North County Library began to detail the needs of each <br />library, it became apparent that insufficient funds had been initially appropnated for any of the projects <br />including the West County Library. Additionally, it was determined that there were a number of up- <br />grades needed at each existing library. <br />As a result of the presentation identifying these shortfalls, the Board restructured the appropriations <br />allocating S2.181.800 for the Main Library and S1,674.397 for the North County Library. Based on these <br />new appropriations, the architectural contracts were revised and finalized with each architectural firm for <br />the respective projects. <br />•Main Library: Currentiv for the Main Library, lessmg out all accrued expenses including all <br />contracted architectural fees, a balance of S2,004.763 remains. The projected construction budget <br />prepared by the architect forecasts expenses of S1.730.000 with a contingency of 5200.000 for a total <br />of $1.930.000. That is slightly less than 575.000 under estimated budget. These estimates also <br />include the building upgrades as also approved by the Board <br />Attached for the Board's information are floor plans for both the first and second floors indicating the <br />expansion work to be performed, a site plan as approved by the Ciry of Vero Beach, and elevations <br />are included to see the proposed results of the outside building envelope once construction is <br />completed. <br />• North County Library: Currently for the North County Library, lessing out all accrued expenses <br />including all contracted architectural fees paid to date, a balance of 51,569.039 27 remains. The <br />Projected construction budget prepared by the architect forecasts expenses of 51,498,436 with a <br />contingency of 568,922 for a total of $1,567,358. When combined with architectural and engineering <br />fees of 5203.298, the total expense is projected to be 51,770,656. That projected cost is over the <br />original funded allocation of 51,674.397 by 596,259. These estimates also include the building <br />upgrades as also approved by the Board. <br />MARCH 13, 2001 <br />-29- <br />