Laserfiche WebLink
DATE <br />FEBRUARY 23, 2001 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMIMSTRATOR <br />FROM: DONALD R. HUBBS, , <br />DIRECTOR OF UTILITY SER S <br />PREPARED MICHAEL C. HOTCHKISS, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT FOR RIVER BEND SUBDMSION <br />FORCE MAIN CONSTRUCTION <br />BACKGROUND <br />River Bend Subdivision is a proposed 646 lot single-family home residential development located at <br />the southeast comer of 63rd Street and U.S. Highway 1. A master planned force main is scheduled to <br />be constructed from the Central Region Wastewater Treatment Facility on an as -needed basis driven <br />by development (see attached copy of master plan map). The force main installation will comprise <br />constructing approximately 1,800 linear feet of 16" PVC along the Lateral "G" Canal right of way, <br />4,150 linear feet of 12" PVC along the 53nd Street and U.S. Highway 1 right of ways and 4,100 linear <br />feet of 6" PVC along the 63' Street right-of-way, from the Central Regional Wastewater Treatment <br />Plant to the northeast corner of the project. RIVER BEND 296 LLC, has agreed to enter into a cost <br />sharing agreement with the County to construct the master planned force main in conjunction with <br />their site development. <br />Attached is a proposed developer's agreement with RIVER BEND 296 LLC for reimbursement of a <br />portion of the subject force main. The Developer's Agreement is stipulated to reimburse the <br />Developer for the County's share of the force main based on itemized invoices of installed materials <br />on a percentage complete basis -less 10% retainage, monthly with final payment and release of <br />retainage at the time said facilities are dedicated to the County (SC — LA of attached agreement). <br />Developer will be required to post a 225% payment and performance bond prior to issuance of the <br />Utility Construction Permit (SC — 14 of attached agreement). <br />ANALYSIS <br />As shown in Exhibit B of the attached agreement, the estimated cost sharing between the developer <br />and the County is as follows: <br />Developer's Share $591452.90 <br />County's Share $4467932.10 <br />Total Project Cost $5069385.00 <br />As homes are built in the project, homeowner's will pay a total of $2,646,016.00 in water and sewer <br />capacity charges. The developer has agreed to pay $458,544.00 to reserve 164 sewer equivalent <br />residential units.(ERU) prior to the County's reimbursement of funds described in the developer's <br />agreement. Construction of the force main will allow the County to coordinate expansion of the <br />wastewater collection system with development of the site, as well as provide sewer service to future <br />development along the improved corridor. The County's total share of $458,544.00 will be funded <br />from the capacity charge fund. <br />MARCH 13, 2001 <br />-41- <br />