My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/2001
CBCC
>
Meetings
>
2000's
>
2001
>
3/6/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 8:32:35 AM
Creation date
9/25/2015 4:14:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
03/06/2001
Archived Roll/Disk#
2275
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: FEBRUARY 26, 2001 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: <br />DONALD R. HUBBS, P.E. <br />DIRECTOR OF UTILITY SER) <br />21 <br />PREPARED JAMES D. CHAST:. ��j�� <br />AND STAFFED MANAGER OF A •�*II NT PROJECTS <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: <br />SEBASTIAN WATER EXPANSION PHASE III -B <br />RESOLUTION III — PUBLIC HEARING <br />INDIAN RIVER COUNTY PROJECT NO UW -97 -17 -DS <br />• <br />BACKGROUND <br />On February 13, 2001, the Indian River County Board of County Commissioners approved Resolutions <br />(Resolution 1) and 2001-017 (Resolution II), which contained the preliminary <br />d the <br />date of the public hearing for the subject project Property 200] 016 <br />dateReso the phe was published rhe inthe PRESS JO rt owners have been notified of he public hearingtbyemail. <br />and copy of Implementation -Attachment -1) URNAL on February 19, 2001. (See attached agenda item <br />Construction of the Phase III -A project area is underway and should be completed by August 2001. Design of the <br />water distribution system has been completed by staff. We are now ready to proceed with Phase III -B. <br />ANALYSIS <br />On February 26, 2001 at 7:00 p.m., an informational meeting was held, in the North County Library, for the benefit of <br />the property owners. Within the Phase III -B project area. which is located East of Laconia Street & West of <br />Shakespeare Street, between Crystal Mist & Lanfair Avenue's there are 527 lots and tracts, and approximately 230 <br />homes, to benefit from this project. Typical platted lot sizes are 25 acre, plus or minus. <br />More effective management of project construction, inspections, cash flows, and interaction with property owners projects This may enable more utility <br />is being accomplished by having divided Phases II and III into smaller rojects <br />construction contractors to bid on these projects possibly making the bid process more competitive. The attached <br />map displays the area to benefit from the assessment projects, as divided into pans A, B, C, D & E, for Phase III <br />(Attachment -3). The City of Sebastian is waiting for the completion of the water line installation in order to <br />complete road & drainage improvements and comply with bonding requirements. <br />March 6, 2001 <br />60 <br />BKII7PG3I9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.