My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/16/2002
CBCC
>
Meetings
>
2000's
>
2002
>
4/16/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:59:48 PM
Creation date
9/25/2015 4:38:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
04/16/2002
Archived Roll/Disk#
2555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.C. NORTH COUNTY LIBRARY - CHILBERG <br />CONSTRUCTION CO., INC. - CHANGE ORDER #3 <br />The Board reviewed a Memorandum of April 9, 2002: <br />Date: <br />To: <br />Thru: <br />From. <br />Subject: <br />April 9, 2002 <br />The Honorable Board of County Commissioners <br />James E. Chandler, County Administrator <br />Thomas W. Frame, General Services Director <br />Lc) <br />6v <br />Change Order # 3, North County Library/Chilberg Construction Co., Inc. <br />BACKGROUND: <br />Attached is a memorandum from Lynn Williams regarding Change Order # 3. <br />Change Order # 3 is composed of $12,894.10 of additions and S2,977.79 in credits or deletions <br />resulting in a net amount of $9,916.31. In addition there are two corrections in the amount of <br />$1,469.89 to earlier change orders that were incorrect relative to the percentage of overhead <br />charged for both additive and deductive change orders resulting in a total net increase of <br />$11,386.20. <br />The generators of these additional costs are lighting fixture additions, truss repair work, <br />insulation, drywall patching to existing penetrations for fire stops in existing walls above ceiling <br />line and additional smoke detectors along with fire sprinkler modifications. <br />The approval of this change order will increase the contract amount to $1,300,164.37. This <br />increase represents a 4.3% increase in the construction bid amount. <br />It is anticipated that substantial completion of the North County Library should occur before <br />June 1, 2002. <br />RECOMMENDATION: <br />In light of the needed reasons identified for these changes, Change Order # 3 has been reviewed <br />and recommended by the supervising architect, and staff recommends approval of Change Order <br /># 3. <br />APRIL 16, 2002 <br />-28- <br />t!_ b <br />
The URL can be used to link to this page
Your browser does not support the video tag.