Laserfiche WebLink
rYi , As r', v i r s., <br /> r r y''a' t ✓ y s v f - n " ��, c <br /> {{� <br /> u' 3 .a <br /> k . :.x +:, <br /> If <br /> ; S:f s.. & w < ..., 4 rd' si a S t d <br /> - _ a-syf , <br /> DATE: MARCH 22, 2000 <br /> TO : JAMES E . CHANDLER <br /> COUNTY ADMINISTRATOR <br /> THRU : DONALD R. HUBBS . , <br /> DIRECTOR OF UTILITY P.E .RZP <br /> PREPARED AND GORDON E . SPARKS, P. E . �p�S <br /> STAFFED BY : ENVIRONMENTAL ENGINEER <br /> SUBJECT: COUNTY ROUTE 510 WASTEWATER IMPROVEMENTS (CR 510/58" AVENUE/77" <br /> STREET TO THE LATERAL G CANAL) CONSTRUCTION SERVICES AND REUSE <br /> FORCE MAIN (58°i AVENUE/771h STREET TO EAST OF THE LATERAL G CANAL) <br /> DESIGN/PERMITTING/CONSTRUCTION SERVICES <br /> REQUEST FOR AUTHORIZATION TO PROCEED WITH PROFESSIONAL <br /> ENGINEERING DESIGN, PERMITTING AND CONSTRUCTION SERVICES TO <br /> MASTELLER & MOLER. CONSULTING ENGINEERS <br /> INDIAN RIVER COUNTY PW PROJECT NO. 9611 <br /> INDIAN RIVER COUNTY UTILITIES PROJECT NO. UCP 837 <br /> BACKGROUND & ANALYSIS <br /> On January 21 , 1997 the Board of County Commissioners entered into a Contract with Masteller & Moler. Inc . <br /> ( See Exhibit A, Excerpt from BCC Agenda) for Surveying, Design and Permitting Services for the four lane expansion <br /> to County Route 512 (Roseland Road to Interstate 1-95 ). The contract was executed under Indian River County Public <br /> Works Department Project #9611 . <br /> As a result of the proposed roadway improvements project design, portions of Indian River County Utilities <br /> existing potable water and wastewater systems along the project route must be relocated. A previously approved agenda <br /> item authorized Masteller & Moler, Inc. ( Engineer-of-Record) to proceed with the necessary design services, permitting <br /> services and services during construction for the proposed relocation of County Utility systems to be compatible with the <br /> County Route 5l2 roadway design ( See Exhibit B, Addendum #3 , Excerpt from BCC Agenda dated July 18, 2000 ) . <br /> This authorization was in conformance with the conditions of the current Masteller & Moler, Inc. contract with <br /> the Public Works Department dated January 21 , 1997 . The original authorization for professional services provided for <br /> specifically in Section III A.21 of the Contract Authorization authorizes the County Utilities Department to enter into an <br /> Agreement with the consultant in the event that relocation of County Utilities facilities design services are required. <br /> The scope of Services for Professional Services was further expanded under the previous agenda item to <br /> included the design and permitting services for the installation of a 12- inch diameter Master Plan Force Main alone CR- <br /> 510, south along 58 " Ave. then east along 77i ' Street to the Lateral G Canal ( See Exhibit B ). The County ' s current <br /> North Regional Wastewater Collection System consists of a single force main alone CR-512 which heads east to US <br /> Highwav # 1 and then south along US Highway # I to the County ' s North Regional WWTF. The need to expand a <br /> section of Master Planned wastewater collection system (See Exhibit C, Sketch of Master Plan Wastewater Collection <br /> System) was prompted by development and hydraulic over-loading of the existing wastewater collection mains. The <br /> County ' s long range planning effort is to construct an additional force main along CR-510, which will allow for looping <br /> of the wastewater collection system and permit future development along CR-510. This will further reduce the hydraulic <br /> overloading of the existing force main along the US Highway # I corridor. <br /> April 17 , 2001 <br /> 64 <br /> t3 �1 s € r r 9 5 2 <br /> 77If <br /> E <br /> If <br /> I IfIf 11 <br />