My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/23/2002
CBCC
>
Meetings
>
2000's
>
2002
>
4/23/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:55:12 PM
Creation date
9/25/2015 4:39:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
04/23/2002
Archived Roll/Disk#
2555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the property and the maximum density under the proposed zoning. The site information used for <br />the concurrency analysis is as follows: <br />1. Size of Area to be Rezoned: <br />2. Existing Zoning Districts: <br />3. Proposed Zoning District: <br />4_ Most Intense Use of Subject Property <br />Under Existing Zoning Districts: <br />5. Most Intense Use of Subject Property <br />Under Proposed Zoning Distnct: <br />Transportation <br />7.21 acres <br />1.59 Acres of RM -6, Multiple -Family Residential <br />District (up to 6 units/acre) and 5.62 Acres of A- <br />1, Agricultural District (up to 1 unit/5 acres) <br />7.21 Acres of RM -S, Multiple -Family Residential <br />District (up to 8 units/acre) <br />10 Single -Family Units <br />57 Single -Family Units <br />Access to the site will be from 78th Avenue, a paved public road with 43 feet of right of way, <br />open to SR 60. If the property is developed in the future, that Right of Way will he expanded to <br />60 feet. <br />As part of the concurrency rev iew process, the applicant has submitted a Traffic Impact. <br />Statement (TIS). The county's Traffic Engineering Division has reviewed and approved that <br />TIS. A TIS reports the number of peak hour/peak season,'peak direction trips that would be <br />generated by the most intense use of the subject property under the proposed zoning district, and <br />assigns those trips to impacted roads. Impacted roads are defined in section 910.09(4)(b)3 of the <br />county's LDRs as roadway segments which receive five percent (5%) or more of the project <br />traffic or fifty (50) or more project trips, whichever is less. <br />According to the approved TIS, the existing level of service on impacted roads would not be <br />lowered by the traffic generated by development of 57 single-family units on the subject <br />property. <br />Water <br />With the proposed zoning, the subject property could accommodate 57 residential units resulting <br />in ater consumption at a rate of 57 Equivalent Residential Units (ERU) or 14,250 gallons/day <br />This is based upon a level of service of 250 gallons/ERU/day. Development on the subject <br />property would be served by the South County Reverse Osmosis Plant, which currently has <br />sufficient capacity to accommodate the additional demand generated by the proposed rezoning. <br />Wastewater <br />Based upon the most intense use allowed under the proposed zoning, development of the <br />property will have a wastewater generation rate of approximately 57 Equivalent Residential <br />Units (ERU) or 14,250 gallons/day. This is based upon the level of service standard of 250 <br />gallons/ERU/day. County wastewater service is available to the site from the West Regional <br />Wastewater Treatment Plant, which currently has sufficient capacity to accommodate the <br />additional wastewater generated by the subject request. <br />April 23, 2002 <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.