My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/3/2001
CBCC
>
Meetings
>
2000's
>
2001
>
4/3/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:40:32 AM
Creation date
9/25/2015 4:17:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
04/03/2001
Archived Roll/Disk#
2277
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Plorida GrAoP"uy"i,lr P_ T,....1 n__ _ <br />The Board reviewed a Memorandum of March 27,2001: <br />TO: James E. Chandler <br />County Administrator <br />HEAD CONCURRENCE: <br />Community Development Dire <br />FROM: Roland M. DeBlois. AICP / <br />Chief. Environmental Planning <br />DATE: March 27, 2001 <br />RE: Approval of Change Order to Contract to Revise Completion Date: Summerlin 's Seven <br />Seas, Inc. Construction of a Ground -Level Boardwalk and Ditch Crossing at the Oslo <br />Riverfront Conservation Area <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of April 3. 2001. <br />On November 14, 2000, the Board of County Commissioners approved a contract with Summerlin 4s Seven <br />Seas, Inc., to construct a ground -level boardwalk and ditch crossing at the Oslo Riverfront Conservation Area <br />(ORCA). The construction work, to cost 55,000, is being funded partially by a 52.400 grant that the Countv <br />has already received from the Florida Greenways and Trails program. The remainder is to be paid from the <br />County's native upland mitigation account (# 127-000-343-071.00). <br />The approved contract (see attached "Addendum 2 to Agreement") contained a typographic error, indicating <br />a required completion date January 8. 2000, instead of the intended date of January 8, 2001. In addition, the <br />original intended completion date has since past due to scheduling issues on the part of staff (and less so on <br />the part of the contractor). <br />Staff is requesting the that Board approve the attached "Change Order No. 1 " to the contract agreement to <br />revise the completion date to May 31, 2001. <br />The proposed revision to the completion date will have no effect on cost or availability of funds as approved <br />by the Board under the original contract. <br />Staff recently conducted a field meeting with the contractor to assess field conditions and to verify the <br />specific location of the —60' long ground -level boardwalk and —12' long ditch crossing. Based on that <br />meeting, the contractor has indicated that once the notice the proceed is issued, construction will be <br />completed in a short period of time, within the revised time frame as proposed herein. <br />April 3, 2001 <br />45 <br />B9 1 17 PG 7 3 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.