Laserfiche WebLink
BACKGROUND <br />On March 8, 2000, the City of Sebastian City Council requested that Indian River County <br />proceed with a water line extension project, due to requests from the benefiting U. S. #1 property <br />owners. <br />On July 11, 2000, the Indian River County Board of County Commissioners authorized the <br />Department of Utility Services to proceed with the design engineering work and award a contract <br />for survey services based on the most favorable quote, in preparation for the special assessment <br />project which will facilitate the extension of water lines along the West Side of U.S. No 1. This <br />project area to be served, will include properties between the Wal -mart Super Center and County <br />Road 512. Preliminary design has been completed by the Department of Utility Services staff. <br />On March 8, 2001 staff met with the City Manager at the Sebastian City Hall and provided a <br />status review of this project. The projects cost estimate, a summary assessment schedule and <br />map were reviewed and left with the City Manager and City Engineer. Enclosed is a letter dated <br />March 12, 2001 from the City Manager requesting the Utility Department to proceed with this <br />project- ( Attachment - 5 ) <br />We are now ready to begin the assessment process associated with this project. (see attached <br />Attachment 1 — copy of minutes of BCC meeting, Attachment 2 —Plat Map, and Attachment 3 — <br />Schedule of Properties to benefit ). <br />ANALYSIS <br />There are 97 properties, between the Wal-Mart Super Center and County Road 512, which may <br />benefit from this proposed water line Extension. In most water assessment projects, properties <br />along both sides of a waterline (typical street situation) share proportionately in the project cost. <br />In this proposed project, which is bordered by U.S. Highway No. 1 and the FEC Railway, this is <br />not the case. Properties on one side only will be responsible for the project cost. <br />Attached are Resolutions I and II for the assessment project. The attached map <br />(ATTACHMENT 2) displays the area to benefit from the assessment project. <br />The total estimated project cost (ATTACHMENT 4) and amount to be assessed, including <br />engineering construction and administration is S 677,406.00 ( Rounded ). The estimated cost per <br />square foot is S 0.352168 (rounded). <br />This project is to be paid through the assessment of property owners along the proposed water <br />line route. In the interim, funding will be from the Assessment Fund No. 473-000-169-397.00. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County Commissioners <br />approve the attached Resolutions, which approve the preliminary assessment roll and establish the <br />public hearing date. <br />LIST OF ATTACHMENTS: I -Minutes BCC meeting July 11, 2000. <br />2 -Plat Map d/ <br />3 -Schedule of Properties / Preliminary Assessment Roll <br />4 -Estimated Project Cost <br />5 -Letter 3/12/01 from the City Manager of Sebastian <br />April 3, 2001 <br />86 <br />�� PG d 7 <br />