My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2007 (2)
CBCC
>
Meetings
>
2000's
>
2007
>
04/03/2007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 12:45:04 PM
Creation date
9/25/2015 4:57:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
04/03/2007
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
3131
Book and Page
132, 611-664
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />Commissioner O'Bryan inquired what would be the cost for the design, <br />engineering, and construction of about 10 roundabouts, without counting right-of-way costs. <br />Mr. Wallwork believed it was dependent on the type of infrastructure desired. In <br />his estimation it would be about $350,000.00 in construction cost, and design cost could be about <br />$50,000.00. Therefore, the total cost would be about $400,000 for a roundabout on 43rd Avenue <br />(a total of $4.Million for 10 intersections improvements). <br />Chairman Wheeler found very interesting the decrease in crashes at roundabouts. <br />He saw roundabouts as less expensive, safer, handle more traffic, and slow traffic down through <br />neighborhoods. He appreciated the presentation and education provided by Mr. Wallwork and <br />hoped the Board could get with staff and see the potential of pursuing this venture. <br />Mr. Wallwork provided more information on the cost for building roundabouts. <br />Vice Chair Bowden asked the Chairman what was the progress from this point on. <br />Chairman Wheeler said this was just for education, to have something to consider, and to have <br />staff look into it to see if it would work for us. <br />Mr. Wallwork recommended a public meeting be held if the County plans to put a <br />roundabout in a specific place. He suggested they look at the roundabouts in Jensen Beach and <br />the PGA development in Port St Lucie, and the County may also want to do some low cost <br />evaluations to look at the feasibility of a roundabout at different locations. <br />Commissioner O'Bryan asked the Chairman if a Motion was required to direct <br />staff to do a feasibility study to identify some of our problem intersections. <br />April 3, 2007 5 <br />BK 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.