My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/13/2003
CBCC
>
Meetings
>
2000's
>
2003
>
5/13/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2017 1:01:53 PM
Creation date
9/25/2015 4:52:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
05/13/2003
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2568
Book and Page
125, 348-375
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.C.2. NEW COUNTY ADMINISTRATION COMPLEX - DONADIO <br />AND ASSOCIATES, ARCHITECTS. P.A. - CONTRACT TO PROVIDE, <br />ARCHITECTURALIENGINEERING SERVICES FOR DESIGN - AIA. <br />B141 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND, <br />ARCHITECT WITH STANDARD FORM OF ARCHITECT'S SERVICES. <br />In announcing this agenda item, Chairman Macht reminded everyone that page 3 of <br />the proposed contract (page 206 in the backup) has been revised. <br />General Services Director Tom Frame reviewed his memorandum and advised that <br />this proposed contract includes design of everything including the road extension (20" <br />Avenue) and bridge to Aviation Blvd. He advised that 3 residences, a small church and <br />three City of Vero Beach sites will still need to be acquired. The independent appraisals of <br />those properties have been received and the property owners have been contacted. The <br />City's property is most significant. The City's appraisal has not yet been received by City <br />of Vero Beach City Manager Rex Taylor. Until the acquisition of the City's property is <br />ascertained, there is no point in moving forward on purchase of the other properties. This <br />brought up the question of the architect's contract. A meeting was held yesterday with Mr. <br />Donadio who has initialed the change (on Page 3)which will limit the scope of his work to <br />the Programming Phase (not site -dependent) until the County gives written approval to <br />proceed (dependent on the appraisals and acquisitions of those properties). <br />Vice Chairman Ginn was anxious to expedite this project and suggested they needed <br />to put a fire under some people. She mentioned other concerns such as the bridge and a <br />traffic study, which she understood would be accomplished by June 15". She appreciated <br />the cooperation of Mr. Donadio. <br />Other contingencies, such as building height restrictions, rezoning, land use changes, <br />open and green space, floor area ratio, parking space design, and the traffic study, were <br />mentioned. <br />May 13, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.