My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/2002
CBCC
>
Meetings
>
2000's
>
2002
>
5/21/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:49:09 PM
Creation date
9/25/2015 4:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
05/21/2002
Archived Roll/Disk#
2557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of May 21, 2002. <br />DESCRIPTION AND CONDITIONS: <br />Old Orchid Phase III subdivision is a 30 lot, 7.28 acre portion of the four phase Old Orchid P.D <br />(Planned Development) project. Located on the north side of CR 510 and east of Jungle Trail, the <br />property is zoned PD and has a L-2 land use designation [low density 2 up to 6 units per acre] The <br />density of the Phase III subdivision is 4 25 units per acre. The first two phases of Old Orchid PD <br />have been platted. Phase I has been completed and Phase II has been partially built out. The roads <br />and stormwater management system withm Phase II are being extended into Phase III to serve the <br />Phase III lots. <br />At its regular meeting of May 5, 1998, the Board of County Commissioners approved the Old Orchid <br />Conceptual PD plan for all four phases. Subsequently, on January 24, 2002, the Planning and Zoning <br />Commission granted preliminary PD plan/plat approval for Old Orchid Phase III. The developer has <br />obtained a land development permit and has constructed some of the Phase III required <br />improvements. Now, the developer is requesting final plat approval for Phase III and has submitted <br />the following: <br />1.A final plat in substantial conformance with the approved preliminary PD plat / plan. <br />2. A certified cost estimate for the remaining required Phase III subdivision improvements. <br />3. A copy of a contract for construction for the remaining required improvements. <br />EM <br />4. A security arrangement guaranteeing the contract for construction. <br />The Board is now to grant final plat approval. <br />ANALYSIS: <br />Some of the required Phase III subdivision improvements have been completed, and the developer <br />proposes to bond -out for construction of the remaining required improvements to proceed with final <br />plat approval. The format of the final plat and the financial security have been approved by the <br />County Attorney's Office, and unit cost for construction items have been approved by Public Works, <br />Utility Services, and the Planning Division The developer has also submitted a copy of the Contract <br />for Construction of Required Improvements All subdivision improvements are privately dedicated <br />with the exception of the utility system, which will be separately warranted through the Department <br />of Utility Services. Based on submission of the previously referenced contract and security, all <br />requirements of final plat approval are satisfied. - <br />RECOMMENDATION: <br />Based on the above analysis, staff recommends that the Board of County Commissioners grant final <br />plat approval for Old Orchid Phase III subdivision, and authorize the Chairman to execute the <br />contract and any security documents and accept the security. <br />MAY 21, 2002 <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.