Laserfiche WebLink
Concurrency of Public Facilities <br />This site is located within the county Urban Service Area. an area deemed suited for urban scale <br />development. The Comprehensive Plan establishes minimum development standards for: <br />Transportation. Potable Water. Wastewater, Solid Waste. Stormwater Management and Recreation <br />(Future Land Use Policy 3.1). The adequate provision of these services is necessary to ensure the <br />continued quality of life enjoyed by the community The Comprehensive Plan and Land <br />Development Regulations (LDRs) require that new development be reviewed to ensure that the <br />minimum acceptable standards for these services and facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For Comprehensive Plan amendment and rezoning requests, conditional concurrency <br />review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since Comprehensive Plan amendment and rezoning requests are not projects. <br />county regulations call for the concurrency review to be based upon the most intense use of the <br />subject property based upon the requested land use designation. For commercial/industrial <br />Comprehensive Plan amendment requests. the most intense use (according to the county's Land <br />Development Regulations) is retail commercial with 10,000 square feet of gross floor area per acre <br />of land proposed for redesignation. <br />The site information used for the concurrency analysis is as follows: <br />1. Size of Area to be Redesignated: <br />2. Existing Land Use Designation: <br />3. Proposed Land Use Designation: <br />4. Most Intense Use of Subject Property <br />under Current Land Use Designation: <br />±10 acres <br />M-2, Medium -Density Residential -2 (up to 10 <br />units/acre) <br />C/I, Commercial/Industrial <br />100 Single -Family Units <br />5. Most Intense Use of Subject Property <br />under Proposed Land Use Designation: 100,000 sq. Ft. of Retail Commercial (Shopping <br />Center in the 6th Edition ITE Manual). <br />Transportation <br />As part of the concurrency review process the applicant has submitted a Traffic Impact Analysis <br />(TIA). The county's Traffic Engineering Division has reviewed and approved that TIA. A TIA <br />reports the number of peak hour/peak season/peak direction trips that would be generated by the <br />most intense use of the subject property under the proposed land use designation, and assigns those <br />trips to impacted roads. Impacted roads are defined in section 910 09(4)(b)3 of the county's LDRs <br />as roadwav segments which receive five percent (5%) or more of the project traffic or fifty (50) or <br />more project tnps. whichever is less <br />May 22, 2001 <br />26 <br />UA <br />