My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/7/2002
CBCC
>
Meetings
>
2000's
>
2002
>
5/7/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:06:46 PM
Creation date
9/25/2015 4:39:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
05/07/2002
Archived Roll/Disk#
2555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. F. BID #4055 - CONSTRUCTION OF CONTAINMENT WALLS FOR THE <br />SODIUM HYPOCHLORITE STORAGE ROOM - NORTH COUNTY WATER <br />PLANT - ZETA TECHNOLOGY, INC. <br />The Board reviewed a Memorandum of April 18, 2002: <br />DATE: <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />April 18, 2002 <br />BOARD OF COUNTY COMMISSIONERS <br />James E. Chandler, County Administrator <br />Thomas Frame, General Services, Director <br />Erik Olson, Utilities Department, Director <br />Fran Powell, Purchasing Manager <br />!L %/ <br />ita-« <br />IRC Bid # 4055 Construction of Containment Walls for the Sodium <br />Hypochlorite Storage Room at the North County Water Plant <br />Utilities Department/Water Treatment Division <br />BACKGROUND: <br />The Utilities Department has requested the construction of concrete containment walls to be built <br />in the Sodium Hypochlorite storage room at the North County Water Plant. These walls will be <br />used to prevent the chemicals from spreading in the event of a spill or leak. In addition the <br />Florida Department of Environmental Protection when it issued the permit instructed the <br />Utilities Department to construct said walls. The bid results are as follows: <br />Bid.Opening Date: April 3, 2002 <br />Advertising Dates: March 13 and 20, 2002 <br />DemandS tar Broadcast to: Five Hundred Twenty Eight (528) vendors <br />Specification s requested by: Ten (10) vendors <br />Replies: Four (4 vendors <br />BID TABULATION: <br />MAY 7, 2002 <br />-24- <br />Vendor <br />Amount <br />Completion <br />1' <br />Zeta Technology Inc <br />Stuart. Florida <br />$9,720.00 <br />20 days <br />7.MGMContracting <br />Inc <br />Cocoa, Florida <br />$10,700.00 <br />30 days <br />3 <br />Jim Wright Construction Inc <br />Vero Beach, Honda <br />$10,890.00 <br />30 days <br />4 <br />Cloud 9 Construction <br />Orlando. Flonda <br />$19.164.00 <br />20 days <br />MAY 7, 2002 <br />-24- <br />
The URL can be used to link to this page
Your browser does not support the video tag.