My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/10/2001
CBCC
>
Meetings
>
2000's
>
2001
>
7/10/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 3:34:05 PM
Creation date
9/25/2015 4:24:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
07/10/2001
Archived Roll/Disk#
2279
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THROUGH: Stan Boling, AICP <br />Planning Director <br />Mark Zans <br />Senior Planner, Current Development <br />FROM: <br />DATE: <br />SUBJECT: <br />June 18, 2001 <br />Brackett Family Ltd. Request for Final Plat Approval for the <br />Hunter's Run Subdivision <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of July 10, 2001. <br />DESCRIPTION AND CONDITIONS: <br />Hunter's Run is a 42 lot subdivision of a 26.4 acre parcel that is located on the south side of 9`11 <br />Street SW (Oslo Road), east of 58`h Avenue and west of the Green Acres Subdivision. The property <br />is zoned RS -3 ( Residential Single-family up to 3 units/acre) and has an L-1 (Low Density 1 up to <br />3 units / acre) land use designation. The density of the subdivision is 1.6 units/acre <br />On November 9 2000 , the Planning and Zoning Commission granted preliminary plat approval for <br />Hunter's Run. The developer, Brackett Family Ltd subsequently obtained a land development <br />permit and has completed some of the construction of the required subdivision improvements. The <br />developer is now requesting final plat approval and has submitted the following: <br />1. A final plat in conformance with the approved preliminary plat, and <br />A cost estimate for the remaining required improvements, and <br />A contract for construction of remaining required improvements, and <br />4. A security instrument to guarantee the construction contract. <br />ANALYSIS: <br />Some of the subdivision improvements have been completed, and the developer proposes to bond - <br />out for construction of the remaining required improvements to proceed with final plat approval. <br />The format of the financial security has been approved by the County Attorney's Office and unit <br />costs for construction items have been approved by Public Works, Utility Services, and Planning <br />The developer has also submitted a copy of the Contract for Construction of Required <br />Improvements All subdivision improvements are privately dedicated with the exception of the <br />utility system, which will be separately warranted through the Department of Utility Services. <br />Based on submission of the previously referenced contract and security, all requirements of final <br />plat approval are satisfied. <br />July 10, 2001 <br />16 <br />BC P 817 <br />
The URL can be used to link to this page
Your browser does not support the video tag.