My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/10/2001
CBCC
>
Meetings
>
2000's
>
2001
>
7/10/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 3:34:05 PM
Creation date
9/25/2015 4:24:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
07/10/2001
Archived Roll/Disk#
2279
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PREPARED JAMES D. CHAST <br />AND STAFFED MANAGER OF <br />BY: DEPARTME <br />SUBJECT: <br />ENT PROJECTS <br />ITY SERVICES <br />DIXIE HEIGHTS, A PORTION OF DIXIE GARDENS <br />ANT) PINEY OAKS SUBDIVISIONS WATER ASSESSMENT PROJECT <br />INDIAN RIVER COUNT\ PROJECT NO. UW -93 -34 -DS <br />RESOLUTION IV — FINAL ASSESSMENT <br />BACKGROUND <br />On May 16, 2000 at a public hearing the Indian River County Board of County Commissioners approved <br />Resolution III No. 2000-061 for the preliminary assessment roll for the above described protect <br />Construction of the project has been completed. <br />The Florida Department of Environmental Protection issued clearance letters and on February 16. 2001 <br />property owners. South of 15th Street SW were mailed notification that the water lines were available and <br />that connections may begin. On March 12 2001 similar notices were mailed to the remainder of the <br />projects owners. Through May 22 2001, 112 applications for connections have been received. This <br />represents 28% of the 405 homes. "Fourteen (14) of these applications were marked, "no water, .. ell <br />going dry, please rush ASAP." 50 of the $1.300.00 capacity charges were paid, (S65 000.00) and 62 were <br />financed. (580,600.00) over 5 years in monthly principal and interest installments of S26.67. Total paid <br />and financed capacity charges of $145,600. <br />Staff is requesting the Board's approval of the final assessment roll. (See attached minutes - <br />ATTACHMENT 1) of the above meeting. <br />ANALYSIS <br />The preliminary assessment was for an estimated amount of 51.379,997.35. which equated to 50.260709 <br />(rounded) per square foot of property assessed. The competitive bid process along with the Utilities <br />Department funding of a master planned 12 -inch water main through the community resulted in a 36.9% <br />reduction in the preliminary assessment costs. The portion of the final project cost to be assessed (see <br />attached Resolution IV and the accompanying assessment roll — ATTACHMENT 2). is 5903.5 71.77 <br />which equates to a cost of $0.186547 (rounded) per square foot and is a project cost reduction of <br />S476.425.58 (34.5%). The final assessment is 50.0742 per square foot (28.46 %) less than the <br />preliminary assessment. Equalization reductions have reduced the onginal assessment square footage <br />from 5,293 258 in the preliminary assessment to 4 843.684 square feet in the final assessment- therefore <br />these two percentages are different. The assessment of a typical 50 -foot lot will be reduced from the <br />preliminary assessment of S 1,303.54 to a final assessment of 5 932.73 for a reduction of S 370.81 <br />Equalization adjustments have been made as staff was instructed at the May 16th, 2000 public hearing and <br />staff proposes further reductions in the assessments for the Helseth Estate and the Florence Sabonjohn <br />properties. which are the two (2) largest parcels in the proiect. The 150 -foot depth rule was applied to <br />these properties and staff recommends reducing this to a maximum of 100 -foot in depth to coincide with <br />the standard single family residential lots in the area. These parcels would still be assessed for 157.534 <br />and 97,000 square feet respectfully. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County Commissioners <br />approve adoption of Resolution I\ , which is anacned and authorize the chairman to execute same. <br />LIST OF ATTACHMENTS: <br />July 10, 2001 <br />Attachment .1) Minutes of May 16, 2000 BCC meeting <br />Attachment .2) Final assessment summary <br />Attachment .3) Map of the project area <br />29 <br />BK II8PG830 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.