My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/9/2002
CBCC
>
Meetings
>
2000's
>
2002
>
7/9/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:28:34 PM
Creation date
9/25/2015 4:42:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
07/09/2002
Archived Roll/Disk#
2558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 9, 2002 <br />Project: <br />cription: <br />Date: <br />Indian River County Department of Utilities <br />COST ESTIMATE <br />BOBBI J SUBDIVISION WATER ASSESSMENT PROJECT <br />UCP # 2161, WIP # 473-000-169-547.00 <br />May 14, 2002 <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit or <br />Measure <br />Unit <br />Price <br />Total Labor <br />Price <br />1 <br />Mobilization <br />1 <br />LS <br />53.000.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />51.500.00 <br />4 <br />Install 6" PVC Water Main <br />900 <br />LF <br />$16.00 <br />$14.400.00 <br />5 <br />Install 6" Dir. Drill Under Conc. Drive <br />90 <br />LF <br />$60.00 <br />$5.400.00 <br />6 <br />Install DI Restrained Fittings <br />0.5 <br />TON <br />$5,500.00 <br />32.750.00 <br />7 <br />Install 1" PE Water Service (5 Sgl. Short) <br />5 <br />EA. <br />$400.00 <br />32.000.001 <br />Install 1" PE Water Service (3 Sgl. Long) <br />3 <br />EA. <br />3700.00 <br />$2.100.00 <br />8 <br />Install <br />w/ 6" GV & Tee <br />1 <br />EA. <br />32.300.00 <br />52.300.001 <br />FFA <br />10 <br />Remove and Dispose <br />of Asphalt <br />1 <br />TON <br />$100.00 <br />$100.00 <br />11 <br />Install S-3 Asphalt <br />10 <br />SY <br />$20.00 <br />$200.00 <br />12 <br />Replace <br />Rock Base <br />10 <br />SY <br />310.00 <br />3100.00 <br />13 <br />Replace Stabilized Subgrade <br />10 <br />SY <br />$6.00 <br />360.00 <br />14 <br />Select fill <br />20 <br />CY <br />$17.00 <br />3340.00 <br />16 <br />Sod and topsoil <br />900 <br />LF <br />32.15 <br />$1.935.00 <br />17 <br />Subtotal Water Sy stem <br />$36.185.00 <br />18 IRCDUS Contingency Account 1 <br />Allowance <br />10% <br />$3.618501 <br />Total Est Constr. Cost 539,803.50 <br />Surveying 1,700.00 <br />Record Drawings 500.00 <br />Design 1,000.00; <br />Bidding & Award 500.00 <br />Permitting 500.00 <br />Construction Services 500.00; <br />Administration 500.04) <br />TOTAL PROJECT COST 45,1)4)3.50 <br />July 9, 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.