My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/13/2002 (2)
CBCC
>
Meetings
>
2000's
>
2002
>
8/13/2002 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:03:50 PM
Creation date
9/25/2015 4:45:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
08/13/2002
Archived Roll/Disk#
2561
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It was noted that there would be an Executive Session following this regular Board <br />meeting. <br />11.G.1. KINGS HIGHWAY (58TH AVENUE) IMPROVEMENTS - <br />ENGINEERING SERVICES - AMENDMENT NO. 16 - KIMLEY-HORN <br />AND ASSOCIATES, INC. <br />The Board reviewed a Memorandum of August 6, 2002: <br />TO: James Chandler, Coun mini trator <br />THROUGH: James W. I _ is .iI c Works Director.. <br />Erik Olson, - )IRC Utilities Director <br />FROM: Terry B. Thompson, P.E., Capital Projects Manage�...:i I <br />SUBJECT: Kings Highway Improvements <br />Engineering Services <br />Amendment No. 16 <br />DATE: August 6, 2002 <br />DESCRIPTION AND CONDITIONS <br />Kimley-Horn, Inc. is under contract with Indian River County to provide professional <br />engineering and surveying services for improvements to Kings Highway. The attached <br />Amendment No 16 provides for design and permitting of approximately 1000 feet of 6" <br />force main and 1800 feet of 8" water main on 4th Street west of Kings Highway. <br />Said force main is a County Master Plan Line The water main will complete the loop from <br />Kings Highway to the existing terminus of an 8" water main on 4th Street on the east side of <br />Pine Tree Park. Incorporating this work into the road construction project will save on the <br />cost of plan production, construction and site restoration. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends approval of Amendment No. 16 in the amount of $10,850.00. Funding <br />is from Account Number 472-000-169-231.00. <br />ATTACHMENT <br />Amendment No. 16 <br />August 13, 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.