Laserfiche WebLink
• <br />ON MOTION by Commissioner Ginn, SECONDED BY <br />Commissioner Adams, the Board unanimously awarded Bid <br />#5006 to Allied Universal Corp.; established an open end <br />contract for the period October 1, 2002 through September 30, <br />2003; and authorized the Purchasing Manager to renew this <br />contract for two (2) additional one (1) year periods subject to <br />satisfactory performance, zero cost increase, vendor acceptance <br />and the determination that renewal of this annual contract is in <br />the best interest of the County, as recommended in the <br />memorandum. <br />7.G. Old Orchid - Phase 3 - P.D. - Kennedy Groves, Inc. Assignment <br />of Contract for Construction of Required Sidewalk Improvements No. <br />PD-02-03-05-CFSC (95060039-30487) to Channing Corporation <br />XXIX <br />The Board reviewed a Memorandum of August 7, 2002: <br />TO: The Board of County Commissioners <br />FROM: William G. Collins II - Deputy County Attorney <br />DATE: August 7, 2002 <br />SUBJECT: Old Orchid — Phase 3 — P.D. — Assignment of Contract for <br />Construction of Required Sidewalk Improvements No. PD-02-03- <br />05-CFSC (95060039 30487) to Channing Corporation XXIX from <br />Kennedy Groves, Inc. <br />On May 21, 2002 the Board of County Commissioners approved the plat of Old <br />Orchid — Phase 3 — P.D. and associated Contract for Construction of Required <br />Sidewalk Improvements No. PD-02-03-05-CFSC (95060039-30487) of the <br />developer, Kennedy Groves Inc <br />The developer has subsequently sold lots within Old Orchid — Phase 3 — P.D. to <br />Channing Corporation XXIX and has assigned its obligation to construct required <br />sidewalks to Channing Corporation XXIX under an Assignment of Contract for <br />August 13, 2002 <br />21 <br />