Laserfiche WebLink
DESCRIPTION AND CONDITIONS: <br />Waterford Lakes Phase II is a 106 lot, 23.0 acre phase of a three phase 60 acre, 262 lot <br />development located on the south side of 12th Street between 12th and 16th Avenues. The property <br />is zoned RM -6 (Residential Multi -family up to 6 units/acre) and has an L-2 (Low Density 2 up to <br />6 units/acre) land use designation. The density of Phase II is 4.61 units/acre. Phase I has been <br />constructed and contains 71 Lots. <br />On September 14, 2000, the Planning and Zoning Commission granted preliminary plat and site <br />plan approval for the entire project, including Phase II Approval was given to plat over a site <br />plan for 106 single family detached residential units in Phase II Development of the units will <br />proceed under the parameters of the approved site plan, and inspections will be conducted via the <br />site plan inspection procedures. <br />The developer is now requesting final plat approval and has submitted a final plat for Phase II in <br />conformance with the approved preliminary plat. <br />ANALYSIS: <br />• <br />The improvements for the project (e.g. roads, drainage, utilities, landscaping) are tied to the site <br />plan which has been approved and released for construction. Thus, site development is controlled <br />by the approved site plan. Therefore, via the site plan inspection process no Certificate of <br />Occupancy will be issued for any unit until required improvements are in place for that particular <br />unit. The only bonding -out for project -wide improvements will be for the required internal <br />sidewalks. The applicant has made arrangements to contract for construction of these sidewalks <br />and bond -out for the sidewalks via a standard construction contract and performance bond. Staff <br />has reviewed and approved the final plat contract, and performance bond and has determined <br />that all final plat approval requirements are satisfied. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners grant final plat approval for <br />Waterford Lakes Phase II and authorize the Chairman to execute a contract for construction and <br />accept the performance bond as security for the sidewalk construction. <br />ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Adams, the Board, by a 4-0 vote <br />(Commissioner Ginn absent) unanimously granted final <br />plat approval for Waterford Lakes Phase II and authorized <br />the Chairman to execute a contract for construction and <br />accept the performance bond as security for the sidewalk <br />construction, as recommended by staff. <br />AUGUST 20, 2002 <br />COPIES OF DOCUMENTS ARE ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />18 <br />