Laserfiche WebLink
ATTACHMENT 3 <br />AUGUST 6, 2002 63 <br />Project: <br />cription: <br />Date: <br />Indian River County Department of Utilities <br />COST ESTIMATE <br />BOBBI J SUBDIVISION WATER ASSESSMENT PROJECT <br />UCP # 2161, WIP # 473-000-169-547.00 <br />May 14, 2002 <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total Labor <br />Price <br />• I <br />Mobilization <br />1 <br />LS <br />53.000.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />31.500.00 <br />4 <br />Install 6" PVC Water Main <br />900 <br />LF <br />316.00 <br />S14.400.00 <br />5 <br />Install 6" Dir. Drill Under Conc. Drive <br />90 <br />LF <br />$60.00 <br />55.400.00 <br />6 <br />Install DI Restrained Fittings <br />0.5 <br />TON <br />35.500.00 <br />$2.750.00 <br />7 <br />Install 1" PE Water Service (5 Sgl. Short) <br />5 <br />EA. <br />3400.00 <br />52.000.00 <br />Install 1" PE Water Service (3 Sgl. Long) <br />3 <br />EA. <br />5700.00 <br />$2.100.00 <br />8 <br />Install FHA w/ 6' GV & Tee <br />1 <br />EA. <br />$2.300.00 <br />$2.300.00 <br />10 <br />Remove and Dispose <br />of Asphalt <br />1 <br />TON <br />5100.00 <br />$100.00 <br />11 <br />Install S-3 Asphalt <br />10 <br />SY <br />520.00 <br />3200.00 <br />12 <br />Replace Rock Base <br />10 <br />SY <br />$10.00 <br />5100.00 <br />13 <br />Replace Stabilized Subgrade <br />10 <br />SY <br />36.00 <br />560.00 <br />14 <br />Select fill <br />20 <br />CY <br />$17.00 <br />$340.00 <br />16 <br />Sod and topsoil <br />900 <br />LF <br />52.15 <br />$1.935.00 <br />17 <br />Subtotal Water System <br />$36.185.00 <br />18 IRCDUS Contingency Account 1 <br />Allowance <br />10% <br />$3.618.50 <br />Total Est. Constr. Cost <br />S39,803.50 <br />Surveying <br />1,700.00 <br />Record Drawings <br />500.00 <br />Design <br />1,000.00 <br />Bidding & Award <br />500.00 <br />Permitting <br />500.00 <br />Construction Semites <br />500.00 <br />Administration <br />500 .00 <br />TOTAL PROJECT COST <br />45,003.50 <br />I <br />ATTACHMENT 3 <br />AUGUST 6, 2002 63 <br />