My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/18/2011 (3)
CBCC
>
Meetings
>
2010's
>
2011
>
01/18/2011 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2016 10:16:20 AM
Creation date
9/25/2015 5:01:55 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
01/18/2011
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4047
Book and Page
140, 377-417
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bob Johnson , Coral Wind Subdivision, asked for clarification on the ownership of the <br /> property . <br /> Steve Melchiors, 1999 Pointe West Drive , revealed that the School District does not yet <br /> own the property, but Pointe West and the Property Owner ' s Association anticipated deeding it <br /> to them in the near future . <br /> There being no additional speakers, the Chairman closed the Public Hearing. <br /> ON MOTION by Commissioner O ' Bryan , SECONDED <br /> by Commissioner Davis, the Board unanimously approved <br /> the conceptual Planned Development (PD) plan <br /> modification to change the Pointe West school site PD <br /> condition from a 200 ' building setback to a 50 ' buffer, as <br /> recommended in the memorandum of December 13 , 2010 . <br /> 10* B. PUBLICDISCUSSIONITEMS <br /> 10. B. I. REQUEST TO SPEAK FROM .JOE WIGGINS REGARDING SIDEWALK ON 11TH <br /> STREET, S. W. <br /> Mr. Wiggins was not present. However, Commissioner O ' Bryan provided background <br /> information on this item, which is related to schoolchildren being forced to walk in the road <br /> because there is no sidewalk . He acknowledged previous discussions with Mr . Wiggins and the <br /> need for a sidewalk, but said that because of the narrow configuration of the road, there would be <br /> insufficient room to construct the project unless the property owners step forward and provide <br /> some right-of-way to the County . <br /> Director Mora displayed a map of the subject area, indicating where the proposed <br /> sidewalk could be located, should the right-of-way become available . <br /> 16 <br /> January 18 , 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.