Laserfiche WebLink
• <br />• <br />Indian River County 1 Impact Fee Update Study <br />Table IX -5 <br />Equipment/Bui dings Replacement Cost <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(8) <br />(9) <br />(10) <br />(12) <br />(13) <br />SourceTable IX 1- <br />Basdon insurance values of existing facilities, information from previous studies for IRC as well as <br />information from otheraF..lorida jurisdictions <br />SourcTable IX -1 <br />Unit val(Item 2) multiplied sbythe numberrof units per facility (Item 3) <br />Source: Tatile1 <br />4,41/4 <br />Unit replacementpvalue (Item2) multiplied by the number of units per facility (Item 5) <br />Sum of the total a uuee for comity parks (Item 4) and the total value of regional parks (Item 6) <br />Facility and equipment value muitiplied by 12.5% based on discussions with Indian River County <br />rftsW <br />Sum of the facilities aeq aunt replacement value and the architecture, engineering, and inspection <br />cost (Item 8) for each park <br />Source: Table IX -1 <br />Total facilities and equipment cost (Item 9) divided by the total number of acres (Item 10) for each park <br />type <br />Source: Table IX -2 <br />Facilities and equipment value per acre (Item 11) multiplied by the level -of -service (Item 12) divided by <br />1,000 <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County <br />93 Impact Fee Update Study <br />Facilitym <br />_ <br />Unit Valuem <br />Neighborhood/ <br />Community Parks • <br />Regional Parks <br />Total Cost <br />$550,000 <br />Description <br />P <br />Basketball Court <br />Unit <br />_ <br />court <br />$55,000 <br />Count (3) <br />5 <br />Total Value °' <br />$275,000 <br />Count Isl <br />5 <br />Total Value m <br />$275,000 <br />Boat Ramp <br />' <br />ramp <br />lane <br />$100,000 <br />0 <br />$0 <br />18 <br />$1,800,000 <br />$1,800,000 <br />Canoe Launch <br />launch <br />$188,000 <br />1 <br />$188,000 <br />4 <br />$752,000 <br />$940,000 <br />Community Center <br />sq <br />ft <br />$180 <br />1,401 <br />$252,180 <br />6,006 <br />$1,081,080 <br />$1,333,260 <br />Dune Walkover <br />walkover <br />$43,000 <br />0 <br />$0 <br />7 <br />$301,000 <br />$301,000 <br />Fishing <br />Pier <br />pier <br />$12,500 <br />1 <br />$12,500 <br />$187,500 <br />14 <br />$175,000 <br />Jogging <br />Trails <br />mile <br />$150,000 <br />1.0 <br />$150,`000 <br />tr 5.5 <br />$825,000 <br />$975,000 <br />Lifeguard Tower <br />tower <br />$25,000 <br />0 <br />d $o <br />5 <br />$125,000 <br />$125,000 <br />Maintenance Facility <br />sq <br />ft <br />$100 <br />0 <br />$Q <br />8,850 <br />$885,000 <br />$885,000 <br />Multi Purpose <br />Bldg <br />sq <br />ft <br />$150 <br />0 <br />" $0 <br />.;1.76,600 <br />$11,490,000 <br />$11,490,000 <br />Olympic <br />Aquatic <br />Center <br />center <br />$3,000,000 <br />,0, <br />_ $0 <br />a.1 <br />$3,000,000 <br />$3,000,000 <br />Picnic Pavilion <br />pavilion <br />$40,000 <br />Ate <br />V $200,000 <br />5,4 <br />$2,160,000 <br />$2,360,000 <br />Playground yg <br />playground <br />$90,000 <br />At ,"S <br />$450,000 <br />8 <br />::sem $720,000 <br />$1,170,000 <br />Restroom <br />restroom <br />$85,000 <br />"`.4 <br />$340,000 <br />28 <br />re$2,380,000 <br />$2,720,000 <br />Soccer Field <br />field <br />$325,000 <br />Nilo <br />$0 <br />$1,950,000 <br />6 <br />$1950,000 <br />Softball Field <br />field <br />$500,000 <br />N2 <br />ift, $1,006,4666 <br /># 12 <br />$6000;000 <br />$7,000,000 <br />Swimming <br />Pool <br />pool <br />t$2 000,000 <br />0 <br />'It. S $0 <br />1 <br />$2,000;000 <br />$2,000,000 <br />Tennis Courts <br />court <br />"x»;$50;000 <br />w 1 <br />Nngb,000 <br />4 <br />$200,000 <br />$250,000 <br />Volleyball Court <br />court <br />$20,000 <br />1 <br />V$25,000 <br />3 <br />$60,000 <br />$80,000 <br />Facilities and Equipment <br />Replacement <br />Value fa <br />• <br />$2,937,680 <br />$36,179,080 <br />$39,116,760 <br />Architecture Engineering, <br />and Inspection @ 12.550114 <br />$367,210 <br />$4,522,385 <br />$4,889,595 <br />$40,701,465 <br />$44,006,355 <br />Total Facilities and <br />Equipment <br />Replacement <br />Value) <br />$3;304,890 <br />Total Number of <br />Acres(1! '. U <br />35.38 <br />511.27 <br />546.65 <br />Facilities and Equipment <br />V Iue perAcre(' A* <br />$93,411 <br />$79,609 <br />$80,502 <br />Level-of-5ervice(12 iAN <br />0.36 <br />5.23 <br />5.59 <br />and.Equipment <br />ment Value <br />RFacilities <br />esid <br />$33.63 <br />$416.36 <br />$449.99 <br />_...� <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(8) <br />(9) <br />(10) <br />(12) <br />(13) <br />SourceTable IX 1- <br />Basdon insurance values of existing facilities, information from previous studies for IRC as well as <br />information from otheraF..lorida jurisdictions <br />SourcTable IX -1 <br />Unit val(Item 2) multiplied sbythe numberrof units per facility (Item 3) <br />Source: Tatile1 <br />4,41/4 <br />Unit replacementpvalue (Item2) multiplied by the number of units per facility (Item 5) <br />Sum of the total a uuee for comity parks (Item 4) and the total value of regional parks (Item 6) <br />Facility and equipment value muitiplied by 12.5% based on discussions with Indian River County <br />rftsW <br />Sum of the facilities aeq aunt replacement value and the architecture, engineering, and inspection <br />cost (Item 8) for each park <br />Source: Table IX -1 <br />Total facilities and equipment cost (Item 9) divided by the total number of acres (Item 10) for each park <br />type <br />Source: Table IX -2 <br />Facilities and equipment value per acre (Item 11) multiplied by the level -of -service (Item 12) divided by <br />1,000 <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County <br />93 Impact Fee Update Study <br />