My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/21/2014
CBCC
>
Meetings
>
2010's
>
2014
>
01/21/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:55:00 PM
Creation date
9/25/2015 5:37:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Book and Page
239
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Indian River County 1 Impact Fee Update Study <br />To calculate the interstate and toll (I/T) facility discount factor, the loaded highway network <br />file was generated for the Greater Treasure Coast Regional Planning Model v3.4 (GTCRPM). <br />A select link analysis was run for all traffic analysis zones located within Indian River County <br />in order to differentiate trips with an origin and/or destination within the county versus <br />trips with no origin or destination within the county. <br />Currently, the only interstate/toll facilities in Indian River County are 1-95 and the Florida <br />Turnpike (SR 19). The limited access vehicle miles of travel`(Limited Access VMT) for trips <br />with an origin and/or destination within Indian River County was calculated for the <br />identified limited access facilities. The total Indian Riyer, County VMT was calculated for all <br />trips with an origin and/or destination within Indian/River County for all roads, including <br />limited access roads, located within Indian RiverCounty. <br />The I/T discount factor of 17.3 percent was determined by.,,dividing the total Limited Access <br />VMT by the total Indian River County VMT. By applying thissfactor to the total Indian River <br />County VMT for each land use in theifee,schedule, tf educed VMT is then representative <br />of only the roadways which are funded by impact fees Appendix B, Table B-1 provides <br />further detail on this calculation. <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County <br />105 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.