Laserfiche WebLink
3 2 DISPOSAL OF DEBRIS <br />A. All vegetation to be removed shall be hauled from the project site and legally <br />disposed at no additional cost to the OWNER Burning onsite is not allowed. <br />3.3 DIGGING AND HANDING PLANTS <br />A. Do not hold for planting more than the time recommended by the supplier and <br />protect from excessive exposure and dehydration. Pack plant material during <br />transport to prevent breakage and drying during transport Trees transported more <br />than ten miles or not planted within three days of delivery to the project site shall be <br />sprayed with an antitranspirant product ("Wiltpruf' or equivalent) to minimize <br />evapotransporation loss. <br />B . Dig balled and burlapped (B&B) plants with firm, natural balls of soil of sufficient size <br />to encompass the plant's fibrous and feeding roots. Do not plant said plants if the <br />ball is cracked or broken. <br />C. Do not handle plants by their stems. <br />D . If plants are marked "BR" on the Drawings they shall be dug with bare roots. Do not <br />cut roots within the minimum spread listed on the Drawings Ensure roots do not <br />dry out during moving or before planting. <br />E Protection of Palms: Only remove a minimum of palm fronds from the crown of the <br />palm tree to facilitate moving and handling Clear Trunk (CT) shall be as specified <br />after the minimum of fronds have been removed. <br />F Excavate tree pits using extreme care to avoid damage to subsurface utilities or <br />adjacent improvements. <br />G. Repair damage to other work caused by plant installation and maintenance. <br />3.4 PLANTING PROCEDURES <br />A. Cleanup the site before commencing the Work and after the Work is completed. <br />Remove all objectionable matter, rubbish, etc. from the site before planting. These <br />materials shall not be mixed with the soil. <br />B . After uniformly grading or hand raking the ground surface prepare the ground prior <br />to planting using appropriate methods. The surface shall be free of ruts and graded <br />in accordance with the Drawings. The ground shall be free of weed growth either by <br />cultivation or spraying of approved herbicides. <br />Last revised 11-18-2013 02240-4 OSPREY MARSH <br />FPublic Works J(eithM\Stormwater Projects\PC South Construction Mork Orders\GK Environmental\Amendment 1\Exhibit 1 Scope <br />of Services - 12-17-2013.doc <br />65 <br />