Laserfiche WebLink
November 2013 <br />MM # 1351 <br />SANITARY SEWER FEASIBILITY STUDY & REPORT <br />NORTH SEBASTIAN AREA <br />TABLE OF CONTENTS <br />INTRODUCTION <br />P urpose and Background <br />Location of Study Area <br />E xisting Physical Considerations <br />GOAL / OBJECTIVES <br />Financial Considerations <br />Indian River Lagoon Pollution <br />Commercial Development <br />P ublic Involvement <br />EXISTING WASTEWATER SYSTEM <br />E xisting Sanitary Sewer System <br />COLLECTION SYSTEM ALTERNATIVES <br />GRAVITY SEWER SYSTEM ALTERNATIVE <br />Study Area #1 <br />Study Area #2 <br />Construction Cost Estimate <br />E XHIBIT 1A — STUDY AREA #1 Proposed Gravity Sewer Collection & Conveyance System (North Section) <br />E XHIBIT 1B — STUDY AREA #1 Proposed Gravity Sewer Collection & Conveyance System (South Section) <br />EXHIBIT 2 — STUDY AREA #2 Proposed Gravity Sewer Collection & Conveyance System <br />VACUUM COLLECTION SYSTEM ALTERNATIVE <br />Study Area #1 <br />Study Area #2 <br />Construction Cost Estimate <br />EXHIBIT 3A — STUDY AREA #1 Proposed Vacuum Sewer Collection & Conveyance System (North Section) <br />ExHIBIT 3B — STUDY AREA #1 Proposed Vacuum Sewer Collection & Conveyance System (South Section) <br />ExHIBIT 4 — STUDY AREA #2 Proposed Vacuum Sewer Collection & Conveyance System <br />LOW PRESSURE SEWER SYSTEM ALTERNATIVES <br />Study Area #1 <br />Study Area #2 <br />Construction Cost Estimate <br />EXHIBIT 5A — STUDY AREA #1 Proposed Low Pressure Sewer Collection & Conveyance System (North <br />Section) <br />E XHIBIT 5B — STUDY AREA #1 Proposed Low Pressure Sewer Collection & Conveyance System (South <br />Section) <br />EXHIBIT 6 — STUDY AREA #2 Proposed Low Pressure Sewer Collection & Conveyance System <br />EQUIVALENT RESIDENTIAL UNITS (ERUs) <br />OPERATION & MAINTENANCE CONSIDERATIONS <br />PROJECT FINANCING <br />CONCLUSIONS & RECOMMENDATIONS <br />