Laserfiche WebLink
November 2013 <br />MM # 1351 <br />SANITARY SEWER FEASIBILITY STUDY & REPORT <br />NORTH SEBASTIAN AREA <br />Sanitary Sewer For North Sebastian Area <br />Indian River County Department of Utilities Services <br />Vacuum Sewer Collection Alternative <br />Item <br />No. <br />Item Description <br />Quantity <br />Unit <br />Unit Price <br />Total Price <br />1 <br />Mobilization <br />1 <br />LS <br />$ 150,000.00 <br />$ 150,000.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />3 <br />Stakeout Survey & As-builts <br />1 <br />LS <br />$ 80,250.00 <br />$ 80,250 00 <br />4 <br />Standard Manholes 0'-6' <br />11 <br />EA <br />$ 3,900.00 <br />$ 42,900.00 <br />5 <br />Standard Manholes 6'-8' <br />10 <br />EA <br />$ 4,500.00 <br />$ 45,000.00 <br />6 <br />Standard Manholes 8'-10' <br />6 <br />EA <br />$ 5,100.00 <br />$ 30,600.00 <br />7 <br />Standard Manholes 10'-12' <br />1 <br />EA <br />$ 5,600.00 <br />$ 5,600.00 <br />8 <br />Pump Station #1 <br />1 <br />LS <br />$ 164,000.00 <br />$ 164,000.00 <br />9 <br />4" Dia. Force Main <br />1,170 <br />LF <br />$ 15.00 <br />$ 17,550.00 <br />10 <br />Testing force main <br />1 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />11 <br />8" PVC Sewer 0'-6' <br />1,175 <br />LF <br />$ 22.00 <br />$ 25,850.00 <br />12 <br />8" PVC Sewer 6'-8' <br />985 <br />LF <br />$ 27.00 <br />$ 26,595.00 <br />13 <br />8" PVC Sewer 8'-10' <br />25 <br />LF <br />$ 38.00 <br />$ 950.00 <br />14 <br />10' PVC Sewer 0'-6' <br />1,590 <br />LF <br />$ 24.00 <br />$ 38,160.00 <br />15 <br />10" PVC Sewer 6'-8' <br />2,270 <br />LF <br />$ 30.00 <br />$ 68,100.00 <br />16 <br />10" PVC Sewer 8'-10' <br />2,025 <br />LF <br />$ 40.00 <br />$ 81,000.00 <br />17 <br />10" PVC Sewer 10'-12' <br />310 <br />LF <br />$ 53.00 <br />$ 16,430.00 <br />18 <br />Testing (TV of Mains) <br />8,380 <br />LF <br />$ 1.50 <br />$ 12,570.00 <br />19 <br />6" Vacuum Main <br />10,910 <br />LF <br />$ 21.00 <br />$ 229,110.00 <br />20 <br />4" Vacuum Main <br />25,755 <br />LF <br />$ 18.00 <br />$ 463,590.00 <br />21 <br />4" Isolation Valve <br />38 <br />EA <br />$ 1,200 00 <br />$ 45,600.00 <br />22 <br />6" Isolation Valve <br />17 <br />EA <br />$ 1,500.00 <br />$ 25,500.00 <br />23 <br />Installed Vacuum Station/Building <br />2 <br />EA <br />$ 600,000.00 <br />$ 1,200,000.00 <br />24 <br />Vacuum Valve Pit <br />365 <br />EA <br />$ 5,000.00 <br />$ 1,825,000.00 <br />25 <br />Specialized Installation Equipment <br />1 <br />SET <br />$ 35,000.00 <br />$ 35,000.00 <br />26 <br />Dewatenng <br />3,200 <br />LF <br />$ 8.00 <br />$ 25,600.00 <br />27 <br />Single Lateral (Gravity) <br />34 <br />EA <br />$ 625.00 <br />$ 21,250.00 <br />28 <br />3' Service Lateral <br />4,060 <br />LF <br />$ 15.00 <br />$ 60,900.00 <br />29 <br />Erosion & Sediment Control <br />1 <br />LS <br />$ 50,000.00 <br />$ 50,000.00 <br />30 <br />Paved Restoration (Open Cut) <br />7,140 <br />LF <br />$ 50.00 <br />$ 357,000.00 <br />31 <br />Un -Paved Road Restoration (Open Cut) <br />1,650 <br />LF <br />$ 12.00 <br />$ 19,800.00 <br />32 <br />Sod <br />41,330 <br />LF <br />$ 4.00 <br />$ 165,320.00 <br />33 <br />SUBTOTAL <br />$ 5,370,225.00 <br />34 <br />Design/Permitting — Final Engineering (7.5%) <br />1 <br />LS <br />$ 402,766.88 <br />$ 402,766.88 <br />35 <br />*Contingencies (15%) <br />1 <br />LS <br />$ 805,533.75 <br />$ 805,533.75 <br />36 <br />TOTAL ESTIMATED PROJECT COST <br />$ 6,578,525.63 <br />I USE - - - - $ 6,600,000.00 <br />Contingencies include easement acquisition, misc. construction items, etc. <br />14 <br />g? -2o <br />