Laserfiche WebLink
KSM Engineering & Testing <br />KSMP.O. Box 78-1377 <br />Sebastian, FL 32978 <br />Tel: (772)-589-0712 <br />Fax: (772)-589-6469 <br />BORING NUMBER SB -1 <br />PAGE 1 OF 1 <br />CLIENT Masteller & Moler, Inc., Earl Masteller, P E PROJECT NAME Sebastian Sewer Feasibility <br />PROJECT NUMBER KSM # 131571-b PROJECT LOCATION Sebastian, Florida <br />DATE STARTED 10/8/13 COMPLETED 10/8/13 GROUND ELEVATION HOLE SIZE inches <br />DRILLING CONTRACTOR GROUND WATER LEVELS: <br />DRILLING METHOD . AT TIME OF DRILLING 6.50 ft / 12:92 NAVD <br />LOGGED BY DP & DH CHECKED BY JEK AT END OF DRILLING <br />NOTES North Side of 82nd Ct., 165' West of 129th Ct. AFTER DRILLING --- <br />a <br />0 <br />0 <br />MATERIAL DESCRIPTION <br />0 <br />>- <br />w <br />w o <br />> U' <br />O CC <br />CCw <br />Hcr <br />Z c) <br />�a <br />>- <br />o' <br />0 <br />A SPT N VALUE A <br />20 40 60 80 <br />PL MC LL <br />1 x 1 <br />40 .60 <br />20 80 <br />■ <br />FINES CONTENT (%) <br />20 40 60 80 <br />■ <br />5 <br />GEOTECH BH PLOTS - GINT STD US LAB.GDT - 10/15/13 11:44 -\1DBB7T4V1\KSM FILES\13DOCS (KSM-SERVER)\131571-B.GPJ <br />• <br />Gray Sand with Traces of Roots <br />Light Gray Sand <br />1-2 Dark Brown Sand <br />• <br />Bottom of borehole at 8.0 feet. <br />• <br />SS <br />SS <br />SS <br />SS <br />3-2-2 <br />(4) <br />2-2-3 <br />(5) <br />2-3-3 <br />(6) <br />3 3-4 <br />(7) <br />A <br />