My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/04/2014
CBCC
>
Meetings
>
2010's
>
2014
>
02/04/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:10:22 PM
Creation date
9/25/2015 5:40:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/04/2014
Meeting Body
Board of County Commissioners
Book and Page
202
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />SECTION 00942 - Change Order Form <br />No. 1 <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR Ranger Construction Industries, Inc. <br />Bid No. 2014009 <br />Project. Indian River Boulevard Resurfacing (US 1 to 17th Street) <br />OWNER's Project No 1302 <br />Engineer: Indian River County <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Eliminate Bid Items 660-4-11 (Vehicle Detector Assembly (Cabinet Equipment)) and 660-4- <br />12 (Vehicle Detector Assembly (Above Ground 4 -Camera System) (Econolite)) <br />Reason for Change Order: <br />These items have been previously installed by others <br />Attachments: (List documents supporting change) <br />Description of Itemized Changes <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$716,499.50 <br />Time <br />Original Contract Time. <br />Substantial Completion: <br />Final Completion: <br />(days) <br />60 <br />Net decrease of this Change Order: <br />$30.425.00 <br />Contract Price with all approved <br />Change Orders: <br />$686,074.50 <br />(days or dates) <br />60 <br />75 <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />CHANGE IN CONTRACT TIMES <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />Description <br />Time <br />Original Contract Time. <br />Substantial Completion: <br />Final Completion: <br />(days) <br />60 <br />75 <br />Net increase (decrease) this <br />Change Order: <br />Substantial Completion: <br />Final Completion: <br />(days or dates) <br />0 <br />0 <br />Contract Time with all approved <br />Change Orders• <br />Substantial Completion: <br />Final Completion: <br />(days or dates) <br />60 <br />75 <br />RECOMMENDED: <br />B y: <br />E NGINEER (Signature) <br />Date: <br />00942 - Change Order No. 1 <br />00942 - 1 <br />F:1Public Works'ENGINEERING DIVISION PROJECTS11302-IR Blvd Resurfacing (SCOP) US1 to 171h SDAdntn\Change Orders100942 - Change Order No 1 doc Rev. 05/01 <br />110 <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />I <br />00942 - Change Order No. 1 <br />00942 - 1 <br />F:1Public Works'ENGINEERING DIVISION PROJECTS11302-IR Blvd Resurfacing (SCOP) US1 to 171h SDAdntn\Change Orders100942 - Change Order No 1 doc Rev. 05/01 <br />110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.