Laserfiche WebLink
rj Sullivan Corp: <br />GENERAL CONTRACTOR <br />October 8, 2013 <br />Mr. Raj Singh <br />Atkins <br />482 S. Keller Road <br />Orlando, FL 33746 <br />Re: West Regional WWTP <br />Anaerobic Tanks. Odor Control System <br />Additional Fill & Drainage at Landscape Buffer PCO No. 01A <br />Dear Raj, <br />Pursuant to your recent request, we offer the following proposal for your consideration. <br />At the location of the new landscape buffer, we will install 6" SDR35 drain piping at each <br />of twenty-two furrows We will cover the intake end of each pipe with filter fabric and 3/" <br />drain rock The pipes will slope to the existing ditch, west of the landscape buffer. We <br />will then regrade the road to cover the pipes. No fill dirt is.included. Our quotation for <br />this extra work is as follows. <br />6" SDR35 Pipe <br />%" Drain Rock <br />Filter Fabric <br />Labor to Install Drain Pipe & Drain Rock (120 MH @.40.00/MH) <br />Supervision (40 MH @ 75.00/MH) <br />Combination Backhoe (1 Week @ 800.00/Week) <br />Bobcat (1 Week Ccs 1000/Week) <br />Subtotal <br />15% Mark -UD <br />Total <br />If you would like for us to perform this extra work, please provide <br />acceptance of this proposal along with your authorization to proceed <br />Sincerely, <br />bert D Mullen <br />Project Manager <br />cc: Proposed Charm Or 1. -. File —Job 34B <br />Z0�1 2nd Street • Pompano Beach, FL 33069 <br />Phone 954-975-0388 • Fax 954-975-3333 <br />3,086.00 <br />1,080:00 <br />170.00 <br />4,800.00 <br />3,000.00 <br />800.00 <br />1,000:00 <br />$13,936:00 <br />2,090.40 <br />$161.26.40 <br />your written <br />119 <br />